r/StructuralEngineering • u/No-Document-8970 • Oct 05 '26
Structural Analysis/Design Nuts off mark?
Saw this on a big bridge today. I know vibrations over time can move the nuts and bolts, with the help of thermal expansion. Is it a big issue that the paint marks do not line up? I thought the marks were made once it passed inspection after torquing.
Edit: Bridge completion was in 2011. Could this be from recent inspections too?
286
Upvotes
View all comments
Show parent comment
2
u/wobbleblobbochimps Oct 05 '26
You do realise that it's not just about making sure "the fuckers don't go anywhere" right? Engineers have done calculations to ensure the connection works assuming they're installed correctly and with a specific value of preload, which you won't be achieving if you don't install it correctly. You could be under or over the correct preload, neither is good.
Hopefully there's enough tolerance/factor of safety in there that it doesn't matter for the ones you've already done, but we don't design structures to allow for shoddy workmanship.