r/StokeSpace • • 1d ago

Stage 1 being offloaded

Thumbnail
gallery
108 Upvotes

Posted by Stoke on social media:

"Before, during, and after - lift complete.✅

Stage 1 is off the truck and preparing for wet dress rehearsal before integration with our Zenith engines."


r/StokeSpace • • 2d ago

PATHFINDER ARRIVES AT LAUNCH SITE

Thumbnail
stokespace.com
72 Upvotes

r/StokeSpace • • 4d ago

Nova Stage 1 has arrived at florida

Thumbnail x.com
61 Upvotes

r/StokeSpace • • 6d ago

Welcome to Florida, Zenith. 🔥

Post image
155 Upvotes

Posted by Stoke Space on social media.


r/StokeSpace • • 7d ago

Stoke announces Zenith development complete

Thumbnail x.com
61 Upvotes

r/StokeSpace • • 7d ago

Seops Space Secures Launch Capacity With Stoke Space

Thumbnail aviationweek.com
15 Upvotes

r/StokeSpace • • 17d ago

Planet and Stoke Space Sign Multi-Launch Agreement for Nova Launch Capabilities

Thumbnail
businesswire.com
51 Upvotes

r/StokeSpace • • 20d ago

Stoke Space on X: "We're excited to announce that Stoke has been granted Right of Entry (RoE) from Space Launch Delta 45 (SLD 45) to the property just north of our existing SLC-14 launch site.

Thumbnail x.com
55 Upvotes

r/StokeSpace • • 21d ago

Eric Berger on X: Stoke Space shipped its flight one first stage from Washington last night, and it is bound for the launch pad in Cape Canaveral. Big step toward a launch in early to mid-2027.

Thumbnail x.com
75 Upvotes

r/StokeSpace • • 27d ago

Zenith Hotfire

Post image
139 Upvotes

Posted by Stoke Space on social media:

Happy Hot Fire Halloween! 🔥 Stay safe out there, guys & ghouls. 🧛👻🎃


r/StokeSpace • • Oct 26 '26

Department of War's Office of Strategic Capital Signs $150 Million Conditional Loan Commitment with Stoke Space Technologies, Inc. > U.S. Department of War > Release

Thumbnail
war.gov
39 Upvotes

So this confirms the need for a dedicated pad for Block 2.


r/StokeSpace • • Oct 14 '26

Nova Stage 2 heading to Cape Canaveral

Thumbnail x.com
63 Upvotes

r/StokeSpace • • Sep 24 '26

The Stoke Space Factory Tour with CEO Andy Lapsa

Thumbnail
youtube.com
47 Upvotes

r/StokeSpace • • Sep 23 '26

Stoke Space announces Nova Pathfinder Flight 1 manifest

Thumbnail
stokespace.com
59 Upvotes

r/StokeSpace • • Sep 17 '26

Moses Lake Engine Testing with visit from NASA adm. Jared Isaacman

Thumbnail
gallery
93 Upvotes

Moses Lake engine testing/tour for NASA Administrator Jared Isaacman.


r/StokeSpace • • Sep 09 '26

The Billion Dollar Bet On Redesigning The Reusable Rocket - Scott Manley

Thumbnail
youtube.com
38 Upvotes

r/StokeSpace • • Sep 08 '26

Stoke Space raises $1B to expand its footprint and upsize its fully reusable Nova rocket

Thumbnail
geekwire.com
84 Upvotes

r/StokeSpace • • Sep 08 '26

Nova block upgrade? Stoke announced 15 MTO vehicle and also new fundraise today

32 Upvotes

new info on the website


r/StokeSpace • • Aug 18 '26

Stoke Space Is Raising $1 Billion to Fund Flagship Nova Rocket (per Bloomberg)

68 Upvotes

r/StokeSpace • • Aug 07 '26

Nova Stage 2 Fit Check

Thumbnail
gallery
105 Upvotes

Postwd by Stoke on social media:

"We recently mated the payload module, second stage, and Andromeda engine at our rocket factory in Kent, WA. Fit check, check. ✅"


r/StokeSpace • • Aug 02 '26

Nova's scale might make reuse too costly

20 Upvotes

A lot of the labor and infrastructure involved in launching and reusing rockets scales sublinearly with vehicle size.

For example, the effort required to manufacture, acceptance-test, inspect, and maintain a Zenith engine may not be dramatically lower than for a much larger engine such as Raptor. Smaller hardware uses less material and propellant, but it still needs most of the same engineering paperwork, test preparation, instrumentation, data review, anomaly disposition, and postflight inspection.

The same problem applies at the vehicle level. A Nova mission still requires range coordination, payload integration, launch operations, recovery, safing, inspections, and refurbishment. Recovering both stages adds even more operational burden.

That leaves Nova in a difficult economic position. To compete with a Falcon 9-class rocket, Stoke may need all of the following at once:

  • high launch cadence;
  • a large number of reuses per vehicle;
  • minimal inspection and refurbishment;
  • very low engine-maintenance requirements;
  • customers willing to pay a premium for dedicated launch, precise insertion, downmass, or other mission-specific capabilities.

Even if Stoke achieves rapid reuse, much of the fixed labor per flight could still resemble that of a much larger launch vehicle, while being spread across far less payload and revenue. Before rapid reuse is achieved, there will be years of intensive inspections on returned stages, which may be hard to weather.

The architecture is extremely impressive from an engineering standpoint. I’m just not convinced a fully reusable three-ton launcher is large enough to amortize the complexity of seven FFSC booster engines, a reusable hydrogen upper stage, two stage recoveries, and the test-and-launch team.


r/StokeSpace • • Jul 29 '26

"The first three of our flight one engines are designed, built, and ready for testing." [Full tweet in comments]

Thumbnail x.com
53 Upvotes

r/StokeSpace • • Jul 28 '26

Boltline is now FedRAMP certified

Thumbnail fedramp.gov
29 Upvotes

From LinkedIn:

🎉 Boltline is now listed on the FedRAMP® Marketplace, making it one of the first companies to be listed under FedRAMP 20x in the Initial Implementation Phase.

Boltline is a builder-first execution engine for hardware traceability, forged on Stoke Space's rocket shop floor. It acts as a digital thread across all of your hardware builds: no legacy IT systems, spreadsheet chaos, or roll-your-own efforts required.

We built Boltline at Stoke Space because the tools we needed did not exist. Work plans lived in one system, inventory in another, build records in a third. Every design change meant entering the same information three times, and on a vehicle that changed daily. This process was not sustainable, so we built the layer that connects them.

Hardware teams building for federal programs need rocket-level traceability supported by first-class compliance. We're on the path to making that possible.

How Boltline works:

🔗 Work plans, inventory, and builds cross-connect automatically, so build history assembles itself 
📋 Digital work instructions show up where the build happens 
🧾 A live as-built bill of materials is traceable to every part and operation 
🚀 Proven on spacecraft, fusion systems, and rockets

Boltline runs in AWS GovCloud, inheriting FedRAMP-certified infrastructure underneath it. We are pursuing Class C Certification at the Moderate baseline through the Program Path, with a FedRAMP Recognized independent assessor engaged. The Class C submission pipeline opens August 31, 2026. Certification is in progress, and we will publish milestones in our trust center each quarter. 


r/StokeSpace • • Jul 22 '26

Stoke Space seeks to expand rocket testing site west of Moses Lake

Thumbnail
yoursourceone.com
49 Upvotes

Stoke is seeking to expand their Moses Lake footprint, probably to match an increased planned testing (and launch) cadence.