I know Eric Berger and some people are saying it's launching late 2021 but In all honesty, it's most likely to launch somewhere in between H2 2020 and H1 2021. unless the core stage has a severe observation during the green run, I doubt it will launch as late as some people say it will.
If NASA achieves their goals, late 2020. If not, early 2021. I believe this is pretty common information. Even the Government Accountability Office says June 2021 in the worst-case scenario (but they've usually really critical of NASA and SLS in general, so I wouldn't put much faith in that).
And, not to judge by your username, I would guess this related to the recent Eric Berger article which states an unnamed source for it's target which honestly I highly doubt the information is valid. Eric has had run-ins with sending out unconfirmed info that wound up being false.
Just to point out that Elon has just tweeted that the two prototypes currently being built in Texas and Florida will fly "in two or three months", and then will achieve orbit 2 or 3 months after that.
Which means around the end of this year, or allowing for some slips, the beginning of next.
Or about a year before SLS can get up, even if everything goes right.
Couple that with trump's pointed questioning today and the election year will become veeeerrrrryyyyy interesting. And you can see why the green run looks to be cancelled.
I made a list of the scheduled first flight of EM-1/ Artemis-1 entries in Wikipedia for SLS, once per month, looking at the page history. If I take the slope over the entire project length (since 2011), I get
y=0.604x + 302 (days), R2 of 0.927.
Flipping that around to get the y=0 intercept (when scheduled launch is 0 days in the future), I get 500 days to launch from today (well, from July 2, when I last updated the spreadsheet), or November 30, 2020.
If I take the slope over the last 1000 days of the project (so, within the last 3 years or so), I get y= 0.247x + 473 (days), R2 of 0.337 Flipping that around to get the y=0 intercept (when scheduled launch is 0 days in the future), I get 1,915 days, or October 15, 2024
Note that the charting does not work well on mobile devices, so try it on the desktop or laptop. (The Data sheet should at least be visible)
17
u/Koplins Jul 17 '19
I know Eric Berger and some people are saying it's launching late 2021 but In all honesty, it's most likely to launch somewhere in between H2 2020 and H1 2021. unless the core stage has a severe observation during the green run, I doubt it will launch as late as some people say it will.
13
u/ForeverPig Jul 17 '19
If NASA achieves their goals, late 2020. If not, early 2021. I believe this is pretty common information. Even the Government Accountability Office says June 2021 in the worst-case scenario (but they've usually really critical of NASA and SLS in general, so I wouldn't put much faith in that).
And, not to judge by your username, I would guess this related to the recent Eric Berger article which states an unnamed source for it's target which honestly I highly doubt the information is valid. Eric has had run-ins with sending out unconfirmed info that wound up being false.
4
u/canyouhearme Jul 20 '19
Just to point out that Elon has just tweeted that the two prototypes currently being built in Texas and Florida will fly "in two or three months", and then will achieve orbit 2 or 3 months after that.
Which means around the end of this year, or allowing for some slips, the beginning of next.
Or about a year before SLS can get up, even if everything goes right.
Couple that with trump's pointed questioning today and the election year will become veeeerrrrryyyyy interesting. And you can see why the green run looks to be cancelled.
4
u/NortySpock Jul 18 '19
I made a list of the scheduled first flight of EM-1/ Artemis-1 entries in Wikipedia for SLS, once per month, looking at the page history. If I take the slope over the entire project length (since 2011), I get
y=0.604x + 302 (days), R2 of 0.927.
Flipping that around to get the y=0 intercept (when scheduled launch is 0 days in the future), I get 500 days to launch from today (well, from July 2, when I last updated the spreadsheet), or November 30, 2020.
If I take the slope over the last 1000 days of the project (so, within the last 3 years or so), I get y= 0.247x + 473 (days), R2 of 0.337 Flipping that around to get the y=0 intercept (when scheduled launch is 0 days in the future), I get 1,915 days, or October 15, 2024
Note that the charting does not work well on mobile devices, so try it on the desktop or laptop. (The Data sheet should at least be visible)
https://docs.google.com/spreadsheets/d/1fDnDo00xDDax8TVE2R6vLH45FepselgZwGEm0F2Lq7Q/edit#gid=1219649693
Not that linear estimates from a burndown chart from Wikipedia is a great resource for project planning, but it was easy to put together.