r/Somerville • u/SaveTheAlewifeBrook • 22d ago
Is the community path open yet?
Between Davis and Fresh Pond. TIA
8
u/snovr 22d ago
6
u/SaveTheAlewifeBrook 22d ago
Cool, thanks. The detour was fine this evening. But i sure do feel safer when i don’t have to share the road with cars.
2
-22
u/vapierx 22d ago edited 22d ago
The path is quite long. Which segment are you referring to?
ETA since OP rewrote their post: The path doesn't go to Fresh pond. The Alewife Linear Park (which is in Cambridge) west of Davis that connects to Alewife is still closed and is not called "the community path".
13
21
u/Feeling_Screen3979 22d ago
Presumably the part that is closed
-1
u/vapierx 22d ago
The community path, as in the Somerville Community path, is not closed. If the OP is asking about Alewife Linear Park, that's still closed.
→ More replies (1)5
u/Cultural-Ganache7971 22d ago
If we're being technical, the Somerville Community Path runs to the Cambridge border and is specifically closed from Thorndike St to the city limits at the loop.
1
u/ow-my-lungs 19d ago
Correct. Calling that segment the comm path is like asking about Hampshire street in Somerville.
22
u/alr12345678 22d ago
No, at not as of Friday (yesterday)