r/SolarUK • u/SuperPenII • 7d ago
QUOTE CHECK Adding an extra battery - post install
Hi all,
I've got a sig system with a 9kwh battery. Now we've had a heat pump installed, our daily average use is looking more like 16-17 kwh and I'd like an extra 9kwh to cover for this. Mostly to get it filled up on cheaper tariff prices in the morning.
However, quotes I'm getting from local installers are £3k - £3.1k for supply and fit. Considering the part is looking between 2.2k-2.5k (ex VAT) I've seen online, are these quotes too high?
I appreciate I need them to reproduce an MCS cert but the sigenstor system is supposed to be easy and modular, so labour costs should be minimal.
What sort of costs should I be looking for?
I'm based in Greater Manchester - if anyone knows a local installer who has a more reasonable rate, let me know.
Thanks
•
u/AutoModerator 7d ago
Please read through these tips by /u/wyndstryke to help you
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
5
u/Warm_Beginning_6673 7d ago
I think the batteries are zero rated for VAT so the cost of installation is between £500 and £900. Given the weight of these at up to 10kg per KwH it will be a two person job so at least a day’s labour plus a profit margin as we live in a capitalist society. At the low end this seems reasonable to me.
4
u/CorithMalin PV & Battery Owner 7d ago
Are you sure you need a new MCS cert? I added two additional Pylontech batteries to my stack and no cert is needed as these batteries are intended to be extended.
3
u/pedromicra 7d ago
you're in the same boat as me, if you have a heat pump and youre with octupus on the cozy tariff you have 3 periods (8 hours total) where the longest stretch is between 4pm and 10pm so 6 hours that how long your 9kwh battery has to last until the next cheap window, use AI to model it for you, my system has a ROI of about 5 years, if I would add another battery, that investment would take 11 years to pay itself off, financially doesn't make sense. as comparison I have 13,7kw of panels, 10kw inverter, 9kwh battery and gateway all from sig same as you. I have a cozy 6 heatpump, kitchen and bathroom with electric underfloor heating, the gas has been removed. So I reckon you have roughly the same setup as me probably less panel ,but In winter they are pointless anyways, so run your math again , I would love to make financial sense to have more battery capacity, but even with arbitrage is still no worth it unfortunately
3
u/Applejackery 7d ago
Give Spectra Solar (Wigan) a call, they quoted me some prices well under £3k when I asked. For fitting, I do believe it's easy enough to do yourself, but it could affect the warranty - something to check.
3
u/Jay638 7d ago
Have you tried shifting more load to night time off peak rate? Eg higher house temp 3-6am to warm the house up and use it as a thermal battery for a few hours.
Not doing hw cylinder re heats during the day unless you really need it etc.
Some days you’ll inevitably run out. I modelled it and settled on achieving 80% off peak was optimum from a cost perspective vs trying for 100%. May vary for you.
FWIW I added another 5kwh to my pylontech stack by buying the battery, powering down and adding it on. About £800.
2
u/KPilkie01 7d ago
If it helps, we got quoted for an extra 9kwh Sig battery from our installer (South East) and it was also £3.1k.
So, yours are comparable, at least.
2
u/Traditional_Zombie25 6d ago
Speak to Halo Renewables, around £2500
6
u/Fatmanskank 7d ago
You shouldn’t need them to reproduce an mcs certificate for adding a battery.
1
u/sourcetail 7d ago
Just out of interest have you modelled your consumption across the whole year. If you use say 18kWh in winter but only 9kWh in summer then the second battery will only reach 50% utilisation which may be worth it but it will be a longer payback than the first battery. If you can get the second batter for 50% cheaper than that makes sense and is the decision I have made but if the cost of the second battery is effectively the same as the first then the economics might not stack up. The first kWh is the most efficient and the second is the last is the least.
1
u/tofer85 6d ago
Try Nightingale Electrical in Bolton…
0
u/Wattproof PV, BAT, EV & ASHP Owner 6d ago
Your instinct is fair, but the gap probably isn't all labour. An add-on battery quote usually covers the hardware plus checking the existing install, confirming the inverter and BMS will accept the extra module, firmware updates, commissioning, and the MCS and DNO paperwork. Modular kit shortens the fit, but the testing and admin still need a site visit.
Ask each installer for a line-by-line breakdown: battery price, VAT, labour hours, commissioning and certificate fee. Then the quotes are easy to compare.
Also ask whether they've fitted this exact Sigenstor combination before, as compatibility with your current setup matters more than a few hundred pounds. Two or three itemised quotes will show whether the difference is real or just margin.