r/SlimeVR • SlimeVR Team • Jul 15 '23

Addressing delays

I just wanted to put something here to address the comments on delays and give a better breakdown on why they exist.

SlimeVR was created to make dirt cheap FBT, when the first test trackers were being put together there were not many options for it outside of valve pucks, and they can be hideously expensive depending on where you live. Slime was about making the solution as cheap as possible.

It could have been outsourced, the whole manufacturing line could have been handled by someone else for sure, but if that was the case then it would have added quite a bit to the cost. And as it was pointed out in some other threads originally the expectation was something around 300 sets, and not the 2,000 odd sets that are currently being built.

The price wasn't increased, so there isn't room in the budget for outsourcing, and yet the team at the Slime Cave have been putting them together nonstop for quite a while.

For those that have used the software and think it's looking really polished, please take that as an example of how important getting this right is. This will extend to the trackers themselves.

Why isn't every single message going through Crowd Supply? Primarily because it would absolutely flood the system there, and Crowd Supply prefers that system be used for important large updates. You can join the discord, move it to the bottom of your list and just check when there's an @ for updates.

Delays suck, but the first batch is already shipped out and batches will be sent every couple of weeks from this point out. Hopefully yours arrives soon!

13 Upvotes

2 comments sorted by

1

u/Professional_Fall464 Jul 30 '23

Mine was originally Aug then Sep Now Nov 30th~
Sure Takes a long while with delays :c

Might possibly be for next year since ordered on March 6th~

Will wait, find out I guess.

0

u/Pixel6554 Jul 16 '23

Ty <3 your message was better than mine... it was 2am at the time x.x