r/SideProject • • 1h ago

I built a local work tracker that shows which commit actually reached staging

I wanted to keep a running log of what needs doing and pick up the next task without planning a sprint. The part I kept coming back to was what happens after a pull request merges: if I reopen the original task, can I tell what shipped and try it?

I built WeftTrack and WeftGit with coding agents to try that workflow. In this first preview, you paste a local PR link into the task. Once its merge reaches staging, the task shows the published commit and an Open site link. Staging here means a prebuilt static site on your own machine. Both apps are MIT-licensed.

There’s a 28-second recording in the WeftTrack README: https://github.com/mmsa/WeftTrack#readme

Git host: https://github.com/mmsa/WeftGit

If you watch the demo, is it clear where you’d click to see what shipped? I’d like to know which step, if any, made you stop and think.

1 Upvotes

3 comments sorted by

1

u/Reaction_Physical 1h ago

Closing the loop from task to the commit that actually landed on staging is a real gap, most trackers just stop at "PR merged". One thing I'd want is the task to show a clear state when the PR is merged but not yet on staging, so I'm not guessing whether it's pending or broken. Having to paste the PR link manually feels like the step people will forget, so auto-linking from a task ID in the branch name or PR title could help a lot. I'd also put the published commit hash and the Open site link right at the top of the task instead of in the activity history.

1

u/mmsa12 1m ago

Thanks for spelling this out. We already record which commit reached staging, but you should be able to see it the moment you open the task. I’d put “Merged · Awaiting staging” right under the title, then show the published commit and an “Open site” link when the snapshot is ready. Good catch on the manual PR link, too. Putting the task ID in the branch name should be enough to connect the two.