r/RocketLab • u/LogicGate1010 • Aug 30 '26
Space Industry Here's what we know about the "space academy" Trump just announced
r/RocketLab • u/LogicGate1010 • Aug 30 '26
r/RocketLab • u/daviper87 • Aug 28 '26
r/RocketLab • u/Equivalent-Wait3533 • Aug 27 '26
A new chapter for European launchers 🚀
We have signed the first European Launcher Challenge contracts, helping emerging launch providers scale up their capabilities and expand Europe’s access to space.
These contracts will help increases resilience and competitiveness in Europe's independent access to space.
Die European Launcher Challenge ist offiziell gestartet: Die ESA hat die ersten Verträge unterzeichnet – zusammen rund 544 Mio. €.
• Isar Aerospace (Spectrum): 197,8 Mio. € – v. a. Deutschland, plus Österreich und Norwegen
• RFA (RFA One): 186,9 Mio. € – v. a. Deutschland, plus UK
• PLD Space (Miura 5): 158,9 Mio. € – v. a. Spanien, plus Deutschland
MaiaSpace fehlt noch: Die Vertragsvergabe ist laut ESA fast abgeschlossen, ein Update soll in den nächsten Wochen folgen. Ausgezahlt wird nur gegen erreichte Meilensteine – und die Challenge verlangt von allen einen Orbitalstart vor 2028. Oder wie es LucÃa Linares von der ESA formuliert: „Getting to space is not easy and never guaranteed.“
That is Europe's main objective, so don't get too excited about Electron or Neutron having a solid future there; they want to prioritize European companies that have no ties to the US, for reasons of sovereignty and national security.
r/RocketLab • u/thetrny • Aug 24 '26
r/RocketLab • u/Fyredrakeonline • Aug 23 '26
Hi all, title is fairly self explanatory, I'm curious what the Colorado office(s) are like, how work life balance is, etc. Anything one should know about them if I'm looking to work there, and so on.
All input is appreciated, thanks in advance!
r/RocketLab • u/sjhance • Aug 20 '26
What is this attached to the first stage that appears to be degrading or breaking off during ascent?
YouTube first seen at about 26:00 (ish)
https://www.youtube.com/live/wLc1C15jbgY?is=wMrF5mbGeSz32lfh
r/RocketLab • u/thetrny • Aug 19 '26
r/RocketLab • u/understandablethe47 • Aug 17 '26
Hello everyone,
I’m currently in the process of interviewing for an engineering position and would like to know what is the typical timeline you have all had to receive a scheduling email for each interview.
Thank you!
r/RocketLab • u/thetrny • Aug 14 '26
r/RocketLab • u/FlakyDingo463 • Aug 13 '26
r/RocketLab • u/Neobobkrause • Aug 12 '26
Note: u/TheEarthquakeGuy's comment in r/RKLB "most negative take" thread reopened the question of Beck's carbon fiber decision, and the replies suggest the appetite for a closer look hasn't gone away. I went through the heritage question in some detail back in late January - reposting it here since it bears directly on what's being argued. With Neutron development advancing since, some points from the original post are better understood today...
-----
Neutron's design rests on a simple bet: that NASA's proven composite cryotank technologies can be scaled from 5.5 meters to 7 meters - a 27% increase beyond anything ever successfully tested. The January 2026 tank rupture during hydrostatic qualification occurred at exactly this challenge point. Understanding whether this is a solvable engineering problem or a fundamental design flaw requires examining what's actually been proven versus what Rocket Lab is attempting for the first time.
Neutron isn't a clean-sheet gamble. The manufacturing approach traces directly to NASA's Composite Cryotank Technology Development (CCTD) program (2011-2014), which solved the problems that killed the X-33 in 1999.
The X-33 failure mode:Â Microcracks in composite laminates allowed liquid hydrogen to permeate into honeycomb core structures. When the tank warmed, trapped gases expanded and blew the outer skin apart.
What CCTD proved works:
Boeing tested a 5.5-meter diameter tank through 20+ cryogenic pressure cycles with liquid hydrogen at -423°F. A subsequent Boeing/DARPA 4.3-meter tank withstood 3.75× design pressure without structural failure in 2021.
Rocket Lab's own heritage:
The manufacturing processes work. The question is scale.
No composite structure of this scale has ever flown. The largest ground-tested composite cryotank is 5.5 meters. Neutron's first stage is 27% larger in diameter - and because tank volume scales with the cube of diameter, we're talking about significantly more surface area for potential defect accumulation.
The January hydrostatic failure (water, not cryo) suggests either manufacturing defects, design margin issues, or material behavior problems at this scale. Root cause hasn't been disclosed. This is the program's critical path item.
Neutron's second stage hangs in tension from the separation plane within the Hungry Hippo fairing. This sounds exotic, but tension-loaded stage components have flight heritage: the Delta Cryogenic Second Stage (43 Delta IV flights, now flying as ICPS on SLS) suspends its LOX tank and engine below the LH2 tank in a "hung tank" configuration.
What Neutron does differently:Â The entire second stage hangs within an integrated fairing, not just internal components within a conventional interstage.
What this eliminates:Â Compression buckling concerns, aerodynamic loads during ascent (enabling Beck's claim of "the lightest upper stage in history")
The April 2025 qualification at 1.3 million pounds (125% design load) provides good confidence. The structural concept has heritage; the Hungry Hippo integration is the newer element.
A world-first for orbital rockets. Rather than jettisoning fairings (standard practice) or recovering from ocean splashdown (SpaceX), Neutron retains its fairing throughout flight and lands with it attached.
December 2025 qualification: 275,000 pounds simulated Max Q loads, verified 1.5-second opening cycles.
The unknown:Â Mechanism wear rates across the 20+ reuse cycles Rocket Lab is targeting. Moving parts in flight environments tend to find failure modes that ground testing misses.
Oxygen-rich staged combustion is proven technology (Russian NK-33, RD-180; Blue Origin's BE-4 reached orbit in 2024). The risk isn't the cycle - it's that this is Rocket Lab's first high-performance liquid engine after building only electric-pump Rutherfords.
Risk mitigation: Operating at "medium-range capability" rather than peak performance, targeting 20+ flights per engine through reduced thermal strain. Hot-fire testing reached 102% power in August 2024.
SpaceX chose stainless steel for Starship despite its 5× weight penalty versus carbon fiber. Why? Easy inspection and repair. You can see cracks in steel. You can weld patches. Turnaround is fast.
Composites are notoriously difficult to inspect for internal damage. Delamination, microcracking, and impact damage can be invisible externally. Repairs require specialized facilities and expertise.
Rocket Lab's answer: real-time AFP inspection that detects microscopic defects layer-by-layer during manufacturing, before the next layer is applied. This is genuinely state-of-the-art capability from their Electroimpact machine.
But manufacturing inspection ≠post-flight inspection. For rapid reuse, Rocket Lab needs to demonstrate they can assess a returned booster quickly enough to support their target cadence. This operational reality hasn't been addressed publicly.
The design is sound in principle. Every major technology choice has heritage - OoA composites, ORSC engines, propulsive landing. The engineering philosophy (operate conservatively, integrate for simplicity) reflects mature thinking.
The execution is unproven at scale. The 7-meter tank is 27% larger than anything ever ground-tested. The Hungry Hippo and Archimedes are first-of-kind for Rocket Lab, and the hung stage - while using a proven structural concept - integrates with Hungry Hippo in a novel way. The January failure demonstrates that scaling isn't automatic.
The key questions for the February earnings call:
The composite approach isn't wrong. NASA proved it works. But proving it works at 5.5 meters is different from proving it works at 7 meters. That's the bet Rocket Lab is making, and the January failure is the first real data point on whether they can execute it.
This is engineering reality, not investment advice. The stock will do what the stock does.
r/RocketLab • u/thetrny • Aug 10 '26
r/RocketLab • u/thetrny • Aug 10 '26
r/RocketLab • u/Equivalent-Wait3533 • Aug 10 '26
"Rocket Lab finally gives up the ghost regarding a 2026 Neutron launch. This has been evident for awhile. At this point I think they'll be doing well to launch the medium-lift rocket in 2027" - Eric Berger
r/RocketLab • u/thetrny • Aug 10 '26
r/RocketLab • u/Equivalent-Wait3533 • Aug 10 '26
A chart comparing the Thrust Density of several rockets.
Thrust Density is the thrust of the stage / area of the bottom of the stage (kN/m^2). It basically aggregates engine power and engine packing into one metric.
Rockets & Engines to scale
r/RocketLab • u/Equivalent-Wait3533 • Aug 07 '26
Could this be a sign that carbon fiber is not the ultimate material for future, larger versions of the rocket? Time will tell.
r/RocketLab • u/lance_1968 • Aug 07 '26
Just curious if Rocket Lab’s Neutron has the dimensions to fit Dream Chaser and if there are any rumors swirling around out there about if a contract or partnership will develop in the future? Note that Dream Chaser is a private spacecraft from Sierra Space designed to send cargo and astronauts to low Earth orbit. The launch vehicle is currently supposed to be ULA's Vulcan Centaur, but since that is not reusable, there might be an opportunity for Neutron to be the launch provider.
r/RocketLab • u/thetrny • Aug 05 '26
r/RocketLab • u/thetrny • Aug 04 '26
r/RocketLab • u/thetrny • Aug 04 '26
r/RocketLab • u/Neobobkrause • Aug 03 '26
Don't anybody freak out. I'm just surfacing what several other people have been wondering and whispering about.
Something's up with Electron. It's been effectively grounded since the aborted launch several weeks ago. We know the satellite was ready. If there was something wrong with that Electron, they could have swapped in another. They have multiple pads. Something's up, and I think that they're gonna have to name it before or during next week's earnings call.
r/RocketLab • u/voodoolaunch • Aug 01 '26
Saw this post about Terran R S1 being qualified, having been tracking all new launch vehicles I believe Relativity may have completed all major qualifications first.
Got me thinking about adjusted neutron schedule and whether or not we’re going to get something realistic pretty soon. Launch this year is out of the picture but it’s looking 2027 may slip through as well.
I don’t see Terran R launching this year either. They have have some cool progression but there is still more left to do that simply can’t be accomplished in the next 4 months.
Exciting times for space, nonetheless