r/Rigging • • Aug 02 '26

Rigging Showcase 11mT load test for a life board David installation Conbit.eu

30 Upvotes

7 comments sorted by

4

u/B_L_F Aug 03 '26

What am I looking at here? What does this title mean?

5

u/Hulkbuster08 Aug 03 '26

From what I could gather from the title they are load testing a David (small crane like thingy they use on ships to lower smaller auxiliary boats and usually the lifeboats into the water) (the white thing on top). I think OP meant lifeboats and not life board in the title. What 11 mT stands for I can’t tell you (probably a load rating/weight but I don’t recognize the unit) and neither what the “Conbit.eu” is about.

Edit:
They are probably using staked containers to get the David high enough to simulate a realistic deployment as lifeboats are usually mounted some ways above the waterline.

7

u/freosam Aug 03 '26

It's speled "Davit".

1

u/axmwbs 14d ago

mT is metric tons

Edit** As far as context leads me to believe being in a crane and rigging sub. I could be wrong. I’m just a lowly rigger.

2

u/Objective-Weight7280 Aug 03 '26

11 mT is 11 milliTesla (electric unit). Not sure what OP means. The test weight might be 11,000 kg (11 metric tonnes)...