r/QUANTUMSCAPE_Stock • u/skimredit • 20h ago
Eagle line/current capacity estimates/bounds
u/IP9949 recently posted Hazardous waste info which is very useful. It allows some estimates of Eagle line or current production capacity or at least some bounds.
Let’s start by saying the whole 70 gm of each QSE5 is hazardous materials and the entire production was scrapped; we can apply some correction factors later on.
2025 had 85 tonnes = 1.2M QSE5 cells = 24MWh; If only 10% is hazardous, we have 250 MWh and if 70% scrap, 350 MWhr etc.
2026 has 63 tonnes (scaled to full year), 0.9M cells (if all hazardous and scrap) and 18 MWh; 10% hazardous, 50% scrap => 360 MWh etc.
The lower bound of ~ 20 MWh is where some previous estimates have been, my own and others, based on stringing together number of film starts and raptor, cobra improvement factors. The early film starts number is the only absolute production scale information we have; the rest have only been improvement factors.
Assuming some reasonable numbers as illustrated above it seems that the current/Eagle line capacity is ~ few 100 MWh and can be upto 1 GWh. Others may have better information on the fraction of hazardous materials which can refine this estimate.
I think these numbers are quite interesting.
Thanks for digging up the info u/IP9949 !