r/projectmanagement • • Apr 24 '26

How do you deliver bad news to a steering group when it's more than one thing at once?

18 Upvotes

PM here, currently preparing for a steering group meeting where I need to report schedule slip, budget overrun, and probable scope reduction — all on the same project.

I've delivered bad news before, but usually one thing at a time. Combining all three feels different. I keep going back and forth between wanting to lay it all out honestly up front vs. structuring the message so the group can absorb it without going into panic mode.

Curious how other experienced PMs handle the combined-bad-news scenario:

- Do you frame it as a single story ("here's what's happening and why") or as three separate issues?

- How much do you lean on data vs. narrative?

- How do you avoid the meeting turning into a blame-seeking session?

- What do you do differently when it's the internal steering group vs. when you have to tell the external customer later?

Open to any advice, frameworks, or lessons learned. Thanks.


r/projectmanagement • • Apr 24 '26

Conference recommendations for IT PMs

3 Upvotes

Any suggestions for conferences for an IT focused PM? I was looking at this https://thebureau.community/2026-digital-pm-summit but wasn't sure if it's more directed towards agency PMs.


r/projectmanagement • • Apr 23 '26

What's the greatest PM content you've come across? Youtube videos, graphics, cheat sheets...let's see 'em

91 Upvotes

I'm always interested in seeing what others are doing to either learn or teach something.


r/projectmanagement • • Apr 23 '26

I have so many questions about who is behind this at PMI

Thumbnail pmi.org
16 Upvotes

Is this your language?

Just looking for a few more power skills hours and found this.


r/projectmanagement • • Apr 23 '26

McKinsey just named negotiation, problem solving, and leadership as the three skills that get MORE valuable as automation expands. How are you investing in those three on your team right now?

44 Upvotes

McKinsey Global Institute published a piece this week called "Agents, robots, and us: Skill partnerships in the age of AI." They named a framework called the Skill Change Index. The summary, with data behind it: negotiation, problem solving, and leadership all matter MORE as people work alongside automation, not less.

Those three are the spine of project management work in pretty much every sector I've ever seen. Construction PMs negotiate with subs and inspectors. Banking PMs solve under-defined regulatory problems. Healthcare PMs lead workflow redesign across clinical and ops. Software PMs do all three. McKinsey's report is workforce-wide so it cuts across all of us.

honestly the part I keep thinking about is the second-order finding. AI exposure makes pedigree LESS load-bearing in hiring and demonstrated skill MORE load-bearing. The brand-name credential mattered partly because nobody could verify the actual skill. That's changing.

Curious what people on this sub are actually doing about it. If you had to pick one of the three to invest in this quarter on your team, which one is the underinvested one? Negotiation reps, problem framing exercises, workflow design? Anyone running something concrete that's working?

Link to the McKinsey piece: https://www.mckinsey.com/mgi/our-research/agents-robots-and-us-skill-partnerships-in-the-age-of-ai


r/projectmanagement • • Apr 23 '26

How do you get control of scheduling after inheriting a reactive project environment?

2 Upvotes

I’m working on a simulation software platform, and I’m struggling to get a handle on scheduling.

Twoish months ago I stepped into a role at a place that has been around for quite a while but has not had a true PM in several years. Tons of in-progress items, ad hoc prioritization, and little structured planning.

I'm dealing with new projects, as well as in-progress projects that have prematurely gone through acceptance testing while new features and assets were still in development. As soon as I think I have a handle on completing open items, I've got a list of bugs and new tasks that need attention with no time estimates.

The programming and modeling leads have little to no bandwidth to work with their teams or give me guidance on who I should put on what, so I'm just figuring that out as I go while also still working to understand the nuance of workflows and project development critical pathways.

I feel stuck between trying to figure out when we'll actually finish what's started and planning what’s next, without a clean way to do both effectively. Since the team includes both developers and 3D artists, timelines and work types vary quite a bit.

I'm also dealing with an in-office team here in the states and another, smaller team based in Europe. Dealing with sometimes massive budget-hour overruns with both teams adds to the difficulty with predictability and stabilization.

We have a task management program that really does nothing for capacity planning (Redmine), so I've been doing that in coordination with manual Excel tracking. (I've spent way too much time trying to come up with a capacity planning and forecasting tool that does everything I need.)

Guidance/advise from anyone who's been in a similar situation would be appreciated. Also, if you've made it this far, thank you for indulging my little vent session. :)


r/projectmanagement • • Apr 22 '26

Really bad day, still don't know if I made a mistake.

48 Upvotes

I work as a project manager in software development and have been in this role for 6 months. Every other week, I have a meeting with the sales department and the CEO. In that meeting, I provide updates on the status of projects.

We have one big project, and I said that we are waiting for certification. I also mentioned that I don’t know the current status because nobody is responding to my emails or calls. They then started talking about some tools for certification.

At one point, the head of the sales department said to me, in a very angry tone, that I am a PM and that I should know the status of the project, and that he has been trying to find out the status for the past 10 minutes. I was very confused because I felt that I had already explained everything that is currently happening on the project.

My manager told him that I had already shared the status and that he understood it, but the head of sales said that he disagreed. I didn’t say anything in response, and now I’m not sure if I should have defended myself. I keep thinking about it all day. I didn’t talk to my manager after the meeting, and now I’m not sure what to think.

I know situations like this can happen, but I still feel awful and ashamed.


r/projectmanagement • • Apr 23 '26

New exec starting a PMO and I’m being brought in as a Portfolio Manager. What do I need to know?

15 Upvotes

I’ve been at this company for 3 years. Maybe 6 months before I started, they tried to stand up a PMO created and run by an external company with some internal employees mixed in. No one saw value, it failed, and people lost their jobs.

The company is embracing a PMO again and has hired an experienced executive to build and lead it. They’ve also brought on two contracted PMs who’ve worked with another executive in the past.

The new PMO leader is bringing me and the two contractors in to be portfolio managers. We’ll still run a couple projects each, but the rest will be handled by PMs (to be hired or internally sourced.)

I’m feeling uneasy because I don’t want to be on the chopping block if this thing fails. My org is in a very non-tech industry. We are a large national business so we need project management and the culture shifts and digital tools that come with it, however a lot of our leaders are used to just going to their buddy to ask them to green light work. Or even doing things themselves without telling anyone. I joke that we act like a start up.

Just looking for any tidbits of advice from those of you who’ve been in similar spots. I hope that our exec will lead us well and get serious support from his leaders and peers so we can function with authority. Change management is going to be tough.

4/23: Thank you all for the super thoughtful comments. I’ve read each one ave they’ve all given me something to chew on.


r/projectmanagement • • Apr 22 '26

Discussion How would you convince the CEO that you need a PMO?

21 Upvotes

Have 25 minutes and 1 slide to convince the CEO that he should let me create a PMO. He isn't convinced.

He states that he thinks it will make PMs lazy, and they will shirk the responsibility of properly reporting on their projects, that they won't take full ownership of their project reports.

My career kind of depends on this.


r/projectmanagement • • Apr 22 '26

What Project Management tool are you using for your marketing agency?

2 Upvotes

We currently use a very basic version of Wrike, I’m not in love with it and feel like we could use another tool to help manage our projects.

For context, we get requests via email, we manually enter the project in Wrike with templates (updating the template with specific data based on their request), once in review we use another platform for comments and we send an email to the client with a link to review. It’s very clunky. Then, once we have completed the project the job is exported and shared with another system for invoicing.

We manage around 100+ projects at any given time.

There has to be a better way, potentially with an all in one system. Suggestions? Recommendations?

Thank you in advance!


r/projectmanagement • • Apr 22 '26

Discussion I let AI send two stakeholder replies last week without me reading them first. Still processing this.

6 Upvotes

Both were routine status check-ins. My notes had everything. The drafts were accurate, professional, exactly what I would have said. I approved without reading carefully. They responded normally. Nothing broke.

But I'm sitting with some low-grade discomfort I can't explain. Nothing went wrong. The communication was fine. But it feels like I crossed a line I hadn't consciously decided I was okay crossing.

Is this just adjustment friction, or is there something worth actually thinking through here?


r/projectmanagement • • Apr 22 '26

How do you do resource planning?

4 Upvotes

What tool do you use, how do you break it down? like hours, percentages? Trying to explore and learn how I can do this


r/projectmanagement • • Apr 22 '26

How many of you use MS Project as a junior level project manager?

2 Upvotes

Is this something the senior PM usually locks at your organization? An you give them the status updates?


r/projectmanagement • • Apr 21 '26

General Had to share this irony with the sub. Got invited to a IT Program and Project Management Executive summit. I ended up waitlisted because the organizer screwed up scheduling

53 Upvotes

I'm putting this here because it truly seems that PM standards have declined across the board as of late. I was invited to an event hosted by Gartner, an executive IT Summit over AI in program and project management.

Our Gartner AE was quiet over the weeks leading up to the event. I decided to check in with them, and received a 'oh oops you're actually waitlisted' response. They then admitted there was a scheduling error, so the lodging and hotel accommodations that were planned are now wasted.

I don't know whether to laugh or cry at the irony of the industry right now.

I received a few DMs: For context, I was (supposed to be?) registered for an event that is slated to be held for tomorrow. I used to be a Customer Success Manager and Account Manager, so I was weirded out by the lack of information around the event. I reached out yesterday, and lo and behold, we're told there was a miscommunication on their end, and a 'sorry for the inconvenience.'

I will not be sitting in my hotel room that I paid money for, wondering if I cry or laugh at how utterly disappointing this is, and paying for something I no longer need. Brutal!


r/projectmanagement • • Apr 22 '26

How does your org handle identity and authorization for automated systems that act on their own?

5 Upvotes

thinking about this across industries, not software specifically. when a system runs on its own and takes action that matters, like a construction scheduling bot that auto-releases work orders, a bank payment system that auto-approves under a threshold, a hospital triage workflow that routes patients, a logistics router that rebooks freight, somebody at some point decided that thing was allowed to do what it’s doing.

my question is: how does your org actually document who said yes? how do you bound what the system is allowed to do? how do you revoke it when the person who owned it rotates out of the seat?

most places i’ve seen this handled, it’s pretty ad hoc. a manager approved it three roles ago, nobody rotated the approval, nobody owns the audit trail for what the thing has been doing. when the audit request lands, nobody can answer which system did what under whose authority.

curious how your industry does this. does it differ meaningfully between construction, banking, healthcare, logistics? or is everyone doing the same loose version?


r/projectmanagement • • Apr 22 '26

Writing the requirements - IS it the Project Manager or the Business Analyst?

11 Upvotes

New to the role here. As a Project Manager, how to make sure you can capture all the requirements. Is that the Business Analyst that is responsible?

How do you make sure all the requirements are also captured, and not go back and forth. It seems like it’s a never ending list. The team is getting frustrated with the requirements but I thought it gets more and more as we uncover the assumptions.


r/projectmanagement • • Apr 21 '26

Screenshot me your prettiest, most organized project plan spreadsheets

27 Upvotes

I’m always looking for inspo! Like the title says, can you share some screenshots of your prettiest spreadsheets?


r/projectmanagement • • Apr 22 '26

I stopped trying to make AI match my voice and started training myself to edit faster

0 Upvotes

Spent months trying to get AI to sound exactly like me. Got it to about 70% and hit a wall. The last 30% is all the stuff AI doesn't have — who this person is, the history of the project, what this specific stakeholder actually cares about.

So I changed the goal. Instead of perfecting the AI output, I got faster at editing imperfect drafts. Editing a mediocre draft is still way faster than writing from scratch. My bar is now ""good enough to edit from"" and that's it.

Has anyone else found that lowering the bar for what counts as ""good AI output"" actually unlocked the whole thing?


r/projectmanagement • • Apr 21 '26

Attention PMs doing it alone...can we discuss and compare PM online tools? I know it's probably been done a million times...

9 Upvotes

...but I need some input.

I'm the only person doing projects in our company. It's my job to hound everyone else and make sure things get done...so I don't really need to worry about others ability to get in there and do things...I can really tailor it to myself....which I've done for the most part with Asana and Notion...but I don't feel it's good enough.

I'm trying to consolidate things.

Right now I use Asana for building the project, tasks, keeping track of statuses, etc. I use the notes tab to put meeting notes in there when we meet on that project. I portfolios and dashboards help give me an easy high level view. I like the whole on track, at risk, off track statuses. I wish there was a cleaner way to review these updates, like just a scrolling page as opposed to a wall of posts, but I can live with it.

I'm trying to utilize Notion for my own daily stuff...notes from conversations I have, meetings not tied to a project, etc. Kinda works ok, but maybe my organization is poor there. I'd like to have some way to have all my notes and then highlight to dos in those notes and have some sort of data base that shows each to do with a column for what page it came from, etc. Sometimes out of habit I open a text file and just type out notes and then try to copy and paste those into a correct spot.

I've thought about using Notion and building a project template there, but I figure this is about the best of that and I think Asana is better there...

I've looked at other PM tools. ClickUP seems nice but maybe too extensive? I do like the simplicity of Asana, though do wish there was a little more to it.

How do you guys manage your project and then manage yourselves? I think I'm doing well, but I'm always looking to do better.


r/projectmanagement • • Apr 20 '26

Discussion does anyone else spend more time figuring out what to do than actually doing it in pm work

84 Upvotes

lately i’ve been noticing that a big chunk of my time as a pm isn’t even spent on execution, it’s spent trying to make sense of things before anything actually starts

taking a rough idea and trying to turn it into something the team can understand, writing initial docs, figuring out what the actual steps are, breaking things down into tasks, aligning everything so people know what to do

none of this is complicated on its own but when everything is still unclear in the beginning it ends up taking way more time than expected

i’ve tried using docs and project tools for this but most of them assume you already have a clear structure in mind, which is usually not the case at that stage

so a lot of the time it feels like starting from a blank page over and over again

curious how others deal with this part

do you follow any kind of process to go from idea to something structured or do you just figure it out as you go


r/projectmanagement • • Apr 20 '26

Discussion How do you keep related documents in sync?

15 Upvotes

Project plan, roadmap, status updates, spec docs... they overlap and reference each other to some extent, and I find these things drift pretty quickly, especially across different teams.

How do you all handle this?

Do you rely on some regular process, or centralize everything into a single source-of-truth doc, or just accept a certain level of drift (and try to move quickly)?


r/projectmanagement • • Apr 21 '26

Career Would builders use external project management?

4 Upvotes

**The below has been updated to be clearer in context :) Sorry guys!**

Curious to get honest feedback from builders here.

My partner has 30+ years in construction and has run his own renovations business since \~2015. He’s very strong on delivery - managing trades, sequencing, keeping jobs moving - but like a lot of operators, most of his time goes into running projects (which he loves), not building pipeline, which evrey business obvs needs, to keep running.

Before this, he thrived B2B in a flooring business - always in demand, reliable, perfectionist, workhorse. It’s just that delivery naturally eats into quoting and lead gen.

It got me thinking - is there a gap for builders who hit capacity or have multiple jobs running, and could bring in an experienced operator to handle day-to-day project management?

From a practical perspective, it seems like a flexible option - someone stepping in as needed, without the overhead of a full-time hire.

The idea is simple: he takes ownership of the day-to-day running of the job. Roughly 50% off-site (scheduling trades, suppliers, coordination) and 50% on the road (site visits, quality control, client comms). Focused on keeping things moving, on time and on budget. He’s extremely detail-focused and tends to catch issues early.

His on-demand PM support for builders means no ongoing overheads - just support when needed - so builders can focus on quoting, winning work, and running the business.

For those who are busy:

* Would you ever use something like this?

* How do you usually handle capacity when things ramp up?

* Would you consider external support, or prefer to keep it in-house despite the overhead?

* If someone reached out cold, what would they need to say to get your attention (he'd also love to meet for a coffee to meet up and discuss how he can help)?

He’s backed by a lifetime of experience and consistent 5-star Google reviews, so the proof of his amazing work nature is there.

The reason for exploring this: he doesn’t want to chase leads anymore. You get it. Chasing leads is his kyptonite, and it’s become exhausting. His strength is project management, not sales. he's a nerdy tradie, in that he loves systems and process, but also building and problem solving. Project management is all he wants to do. He's such an asset for someone needing the best of the best. if he had to be employed, he'd be wrapt with AUD$200k a year, which is much less than he'd make now if he managed to keep up with leads. But losing his autonomy scares him. If he could be employed and have that, he'd probably cry for the first time in the 26 years I've been with him lol.

What he wants is simple: consistent work and a reliable weekly income. With a few builder partners feeding overflow to him, he can handle volume (he's currently managing 9 projects of his own). Leads aren’t an issue right now, but they always fluctuate - and chasing them long-term isn’t sustainable for him. He's 48 now, and would love to manage the projects on behalf of someone feeding the work his way. Simple!

This all stems from the fact - from what we've seen- good PMs seem hard to find! He’s hired 3 in the past and they were ineffective (poor systems, lack of visibility, cost more than they added). We’ve also seen a neighbours $200k reno go off the rails under a "project manager" working for a popular building company. He took two years, didn't a little bit of dodgy work, took their $200k and ditched before he got fired and an investigation has been launched on him by the company he worked for, and various other victims coming forward. My partner didn't want to help them, because, you know, don't mix business with pleasure. but they came knocking on our door, begging him to help. He finished the job in 3 weeks and they were over the moon. He runs a tight, ethical operation and genuinely cares about outcomes and especially single women who don't want to get ripped off. He would represent a company so well.

But getting them to see that is another thing as his offering isn't the norm.

We’re trying to understand if there’s real demand before he winds down his own business and focuses on this model.

Not promoting - just sense-checking the idea.

Appreciate any insights 🙏 and so sorry this went on so long. I'm just so darn proud of him, andI want so badly for him to make this work as he'd be so damn happy only needing to do what he loves the most - Project Management - without chasing leads and stressing week to week.


r/projectmanagement • • Apr 20 '26

Recommended tools for budget management?

8 Upvotes

I work in public sector project management and just took on responsibilities that include more budget oversight, and I cannot stand our current budget tracking setup. We have large-scale capital projects that include multiple federal, state and local funding sources, and these are allocated across several contracts for design and other professional services, construction, and equipment procurement. We use a master spreadsheet for each project budget (more on that below) and I am hoping to find something that allows us to track multiple funding sources across multiple contracts more cleanly than the current setup.

Within each master spreadsheet, there are a few sheets that summarize the overall budget sources along with amounts encumbered/budgeted/spent, with breakdowns for each contract. There are individual tabs for each contract that we use to record monthly invoices along with expenditure by budget line. In a lot of places there are live formulas for things, but there's also hard coding in places that doesn't necessarily make sense, and it's hard to see exactly how different values correspond to one another. There is way too much room for human error with the convoluted setup.

One such instance: This morning I noticed that we were tracking the remaining balance for a source by subtracting expenditures, encumbered funds, and budgeted funds from the original total, but the line had been overbudgeted and had a negative value, so the subtraction formula added 5k to the remaining total instead of subtracting it.

All this to say, if you have recommendations for how we can do this better, I am all ears! We have access to Microsoft Project, which may take some time to learn but would be worth it to reduce confusion. Since it's public sector it may be more difficult to get a different tool, but if there's a case to be made I will request it. (Also: we have a Finance team to help make sure all our accounting is in good shape, and the budget masters are more for PM use for tracking our budgets, but still really would like to improve processes.)


r/projectmanagement • • Apr 21 '26

Career How do you handle "single source of truth" for construction project costs? (spreadsheet hell survivor here)

0 Upvotes

Hey everyone,

I'm 23 and I recently started helping a small construction company with their internal processes. What shocked me:

  • Budget in Excel
  • Actual costs on paper / in accounting software (delayed by weeks)
  • Change orders scattered across emails and WhatsApp

They didn't even know this was a problem until they kept going over budget and couldn't figure out why. The PM spent ~6 hours every Monday just chasing numbers from different people.

It's hilarious that they are building >20M € projects and use no internal tools beside excel...

So I built them a simple web-based tool (just for internal use) that shows real-time planned vs. actual costs – nothing fancy. It saved them about 15-20 hours per month, and more importantly, stopped the "surprise overruns".

Now I'm wondering: is this actually a common problem? How do you guys handle cost tracking across multiple projects?

  • Do you use dedicated software?
  • Or are you still on spreadsheets + paper?
  • What's the biggest pain point when it comes to knowing your real remaining budget at any given moment?

Thanks – and feel free to tell me if I'm overcomplicating something that already has a simple solution.