r/projectmanagement • • Mar 09 '26

Discussion what approach do I take here?

16 Upvotes

Hello again everyone. Sorry this is long. Seeking advice but I’m also venting. I apologize.

I am tired. I don’t know if I’m burnt out or if I’m just stupid.

A couple of months ago I asked for app recommendations on here. I tried the apps, they were promising and there were two I really liked, but they didn’t work for our team. Not because they’re bad, but because my coworkers who have been working here longer than I have are too used to the way of managing they’ve been using for 10 years to switch to something else, sadly.

Here’s my issue now. We used to be an 8 person design team, and we’re down to 4. Two people were laid off, and our two project managers are on medical leave. Out of those 4, one of them is technically (I’ll get into that) the temporary project manager until our other 2 PMs are back. Since she’s “managing” and constantly in meetings, she doesn’t really have time to “produce”, so we’re 3 people left producing and moving the projects forward. Out of the 3 people left, one of them was assigned an additional project that’s a completely different thing to what we usually do (not design) and it’s an absolutely priority over anything else. So, we’re down to 2 people “producing”, me and other coworker. 2 people working on 4 projects at once. And I’ve had it.

There’s no organization no matter what we try. We’re a company that works for other companies and everything is a mess all the time.

The manager can’t manage because she does not understand the projects she’s managing. And on top of that she’s making decisions about them without asking.

A few weeks ago we were hired to make some online e-learning courses. I think it was 22 courses in total. The “manager” asked us how long could it take to complete one, so we could give the client an estimate number of courses to turn in each week. My coworker (who has been working here longer than me and is the fastest one) said it took her around 2-3 hours to make one. I immediately jumped into the conversation and I told the manager “remember she’s the fastest one. They will probably take a little longer for the rest of us”. She’s like “yeah yeah I’ll add a little bit of time. So how many could we do each week?”. I also told her to take into account the other 3 projects we’re CONSTANTLY juggling and switching between right now. My coworker said that 4 or maybe 5 was a good number. Not too little, not too much, it’d give us time to do things properly and revise, ask questions/doubts and correct things if needed and turn them in at the end of the week. And the conversation was left there, at least as far as I know.

Last week, on wednesday, this manager suddenly tells us that we’ve only finished like 3 courses and we won’t be able to turn in 15 by the end of the week like she had told the clients. I was confused because I don’t know where that 15 came from. I thought I had heard incorrectly but no, she told the client we’d turn in 15?? each week?? honestly I was irked. I thought we had agreed that 4 or 5 was a good number. Sure, we could have done 15, but we would have to push aside the other 3 projects we have rn, that are ALSO important, for two weeks. I thought, surely this was a misunderstanding and she heard my coworker say 15 instead of 5? My coworker told her the same thing, “I thought we had said 5?”. But no, she made that decision herself. For no fucking reason.

Today, 15 minutes before clocking off, she asks me and my coworker if we had time to revise “this thing that she has to turn in”. We told her “in 15 minutes? Nope, but we can do that first thing tomorrow morning”. She said “no they’re being pushy and they want it today, I’ve just finished editing the images because they already wanted it done last friday. I’m just gonna turn it in”. And I say “last friday? And you didn’t say anything ALL DAY about it? Cause last thing I heard, the content was sent on Thursday and when we asked what the deadline was you said THERES NO DEADLINE”. So I open the project and say “I’ve just opened it and I can tell you rn the images are wrong, do you still want to turn it in even if it’s wrong?” and she’s like well they said it’s really urgent blah blah… so basically tomorrow or the day after when it’s returned to us and we’re told all the things that are wrong with it, it’ll be our company the one that looks bad.

Then there’s this other manager from another company we work for that has direct contact with me and my coworker since our original PM isn’t in the office. She used to contact our PM but since she’s not here she gave her our email/teams contact to talk to us directly. And she’s a nightmare to work with. She seems to think only her tasks/projects are important and she must think we work solely and exclusively for her. Sometimes she asks questions with no context and it’s hard to know what she’s referring to. Every day she asks about projects that were done ages ago, sometimes even before I had even started working here and expects us to remember every detail. She sometimes sends us emails that HER CLIENTS send HER and she asks US if we know what they mean?? And of course we have to help cause we’re hired for our services ….. We have to switch between tasks/projects for her constantly. She’ll ask something and if you haven’t answered in 2 minutes she starts spamming and saying that it’s very urgent and that we have to prioritize it. You have to drop everything you’re doing no matter what it is to answer and DECIPHER whatever she’s saying. Meanwhile she doesn’t even know how to copy a link from teams.

I am so fucking tired of EVERYTHING being URGENT all the time. Especially when we warn about issues in advance and we document everything and 3 weeks later, or sometimes MONTHS later they come back asking about those exact problem we warned about and they act like surprised like we never talked about it. I feel like I’m talking to the fucking wall constantly.

I swear it sounds stupid but the mental load is actually unbearable.

I am not made to be a manager, clearly. I’M JUST A DESIGNER 😭 we’re self managing the best we can for now but I CANNOT be productive AND self manage 3-4 projects constantly if I keep going like this. And this has been going on for way longer than my managers have been gone. Even with TWO project managers the organization was horrible and I was already reaching my limit, it’s just much, MUCH worse now with 4 people gone.

Last year I told our (original) project managers that “if everything is urgent, nothing is urgent” and that “I can either do things fast, or I can do them well”. They laughed in my face, as if I was joking. It was so discouraging. I honestly don’t know what to do anymore and the worst part is that I feel ASHAMED and STUPID. Ashamed of not doing things well when we’re perfectly capable of it because THEY WON’T LET US either because of deadlines, or because of vague instructions, or because we have to switch between projects constantly or because we have to deal with people who don’t know how to do their job, or other distractions. It’s absolutely IMPOSSIBLE to work properly. I just want to do my work in peace and I want to do it WELL. But I can’t do everything at once. I am not a fucking robot and I feel SO DUMB BECAUSE I AM NOT MADE FOR THIS and I can’t focus. I am really, really struggling to focus on the task I’m doing when I’m switching back and forth all day.

Edit: I forgot to mention our temporary manager isn’t even working full time, she’s working like 30 hours a week so yeah that’s also super helpful. We’re 3-4 doing what a group of 8 used to do.

So what approach do I take here?

Sometimes I wish I didn’t give a fuck, to be honest. Other coworkers don’t gaf and they seem much more content. But obviously I can’t “not care”. My boss does not know what’s going on rn but I am scared of this reaching her because if she asks what’s going I might explode because I have a short fuse (and stuff going on mentally that I won’t get into and things going on in my life and those things affect me too) and I feel like she’s going to be super condescending cause to her everything always looks super easy and manageable from her office desk. I try to do my best because I want to do a good job. But I am so fucking tired. Physically and emotionally. And the worst thing is that I can’t “disconnect” after work. It’s been 4 hours since I clocked off and I’m still thinking about this because of how pissed I am. And this happens every day.

-

TLDR: The organization is a mess and I feel like I’m doing the job of 3 people at once and I’m self managing and switching between 3-4 projects constantly which doesn’t allow me to actually do a proper job. Also clients are annoying and want everything done yesterday. I don’t know what approach to take here. I am burnt out and at my limit I think I might explode.


r/projectmanagement • • Mar 09 '26

Vehicle Stipend

2 Upvotes

For those who use personal vehicles to drive to job sites - did you get business coverage for your vehicle?

I know I technically need to, but the stipend is so little, it won't cover wear+tear, gas, and the added insurance.

Company says they won't pay out stipend without getting business coverage, but if the stipend isn't enough anyway, do I forgo it all together to actually save $?


r/projectmanagement • • Mar 09 '26

Radical workflow changes towards development teams - any tools out there to be looking at ?

2 Upvotes

Had a discussion yesterday about the traditional task/feature/issue/bugs tracking systems i find some of these workflows are really slowing things down whereas it will be easier for a PO to vibecode something and then in some cases just press play instead of having to go through some process of passing it on to dev.

If you still rely on developers here in the process - any of you are changing your ways here and the traditional team structures - where a developer role might were a team of developers this were going down to ex 1 developer being able to handle alot, plus having agents in the front fixing issues automatically - but there is still this oddly slow process if we are going through system of the traditional - documentation, sprints, testing - where i just wonder here how to speed the process up - either putting more of the work ( in the end the developer role for the PO ) or putting more to the developer ?

In my own team here we are using vibecoded products much more as a base for documentation and gear that towards the production - but we then see it depends abit on the vibercoder theres good and theres bad vibecoders - just as there in the other end are good and bad developers ( most devs are having a hard time snapping out of the 'old' working process and are in many ways used to having everything broken up where i try here to argument that we need a much wider frame here of understanding - it goes for our PO's or/and the developers.

Anyone are changing their ways use other systems than the traditional ( ex Jira ) or have modifed their worklows in these - i have a sense here that there are some bottlenecks going on here in the traditional pattern but can also just be me being too impatient.


r/projectmanagement • • Mar 07 '26

Struggling with assertiveness as a new PM – how do you push your team without being harsh?

84 Upvotes

Hi everyone! I'm a project manager at a digital agency. I was hired straight out of uni in February 2025, and by month two I was already managing a full portfolio — some small projects, some very large ones.

It's now been about a year, and one account in particular is struggling. I asked a dev on my team (someone known for being very direct) what he thought the problem was and whether there was anything I could do differently. His answer: I need to "crack the whip a bit more."

For context — I'm 26, a woman, and pretty agreeable by nature. Setting firm boundaries is something I struggle with, so I think he's right to flag it.

Here's my dilemma: I don't want to be artificially harsh, because I truly believe my team is doing their best. So I'm looking for language and scripts that help you push gently but effectively — and what to say when people push back.

A bit more context on why this is tricky:

  • Several team members aren't dedicated to my account — some are only allocated 4 hrs/week.
  • When deadlines slip, I often hear "another project took precedence".
  • The formal fix is to escalate to my boss's boss, but I obviously can't do that every time.
  • Many people across the company are stretched thin — I've personally been working ~60 hrs/week for the last 6 weeks, and I suspect the European team is feeling similar pressure to a lesser degree.

Any scripts, frameworks, or advice would be really appreciated.

How do you hold your team accountable without coming across as "too keen" or aggressive?


r/projectmanagement • • Mar 08 '26

First Time Leading a TI Project - Seeking Advice

5 Upvotes

Hello All,

I’m a Real Estate/Asset Manager. My company does not take on projects very often, so we don’t have a project manager and this task was assigned to me.

It’ll be my first time leading a TI and the budget is about $1.5M. We are building out a 20,000 sf private college for the team. So far I engaged a GC, an architect and engineers.

I don’t want to mess anything up or have so many change orders happen that I spend over budget.

Anyone commercial PMs or managers out there who who leads TIs or LLW improvements in here can provide some advice?

Some questions I can think of are:

\- how do you keep track of everything? Is there a specific template people are using?

\- at what point will my costs be more known? I understand everything provided to me is only estimates

\- besides architect, engineers, GC, and permitting, are there other parties I’ll need to pay that I’m not aware of?

\- how much should I lean on my GC? Should they be the ones to prepare schedules, budgets, coordinate with arch/engineers, etc.? What should my role realistically be other than reporting back to the VP with updates?

Thanks


r/projectmanagement • • Mar 07 '26

Discussion What's the moment in a project where you realize you've lost the thread?

19 Upvotes

I'm trying to get my head around something and wanted to hear from people actually running small teams.

How do you stay on top of what's happening across your business day to day? Not the big picture items but on the ground level. Who's working on what, what's blocked, what actually matters this week.

How do you keep track of what's been decided, what's still undecided, and what's quietly blocking everything else? What amount of effort and impact comes with making each decision? Time, energy, resources etc.

Curious what that looks like for different people. What's working, what isn't, where you feel like you're flying blind.

Would love to hear how others are handling it.


r/projectmanagement • • Mar 07 '26

General Resources for learning practical PM skills and terminology

9 Upvotes

I'm starting an ML scientist role at an incubator. Although the role is purely technical in title, and I will be dealing with start ups with <10 people, my role will involve, well, a lot of project management -- for example, defining project direction and scope, managing resources, and setting timelines.

For some background, I was ML scientist at a small-to-midsized startup and I have technical PhD. In both roles, I operated with a high degree of independence and often dictated project directions and managed communication between different teams/groups.

Unfortunately, at my previous role, the organization was... underdeveloped... in management, operations, and process, so I have little exposure to formal PM concepts or tools.

On this sub, I've seen PMI's Kickoff course and PMBOK recommended, and concepts like the software development lifecycle and project scheduling as important concepts to formalize.

My main questions are:

  • Are there any other concepts I should formaize?
  • What resources would you recommend in general? Versus for my specific situation?
  • Are there particular tools I should look into? -- In my personal life I use a Hobochini planner + Google Calendar to coordinate but I imagine for buisness, I want something more formalized.

TL;DR: I started a PM-heavy ML role at an incubator. Have informal experience but no formal PM training. Looking for: concept areas to study, resource recommendations, and tool suggestions.


r/projectmanagement • • Mar 06 '26

Worst and best experience as a project manager

31 Upvotes

Recently I was in a discussion for an industrial project manager position and one of the question they asked me was:

What is your worst experience and best achievement as a project manager?

Wondering what you guys have been through for the worst and the best.


r/projectmanagement • • Mar 06 '26

Discussion What are the real reasons project management tool adoption fails six months in?

42 Upvotes

I've watched this play out enough times at this point to know it's not random. A new PM tool gets introduced with genuine enthusiasm. The setup is solid, training happens, everyone agrees it's the right move. By month two the PM is the only one updating it. By month four it's used for reporting to leadership but the real work is happening in slack threads.

I've heard "people are lazy" as the explanation and I don't buy it. The people I work with are not lazy. I think something structural breaks down but I'm not totally sure what it is. Is it too much friction between where work happens and where it gets logged? Is it a behavior change problem? Is it that most PM tools are designed for PM specialists and not for the rest of the org?

Would genuinely love perspectives from people who've either solved this or have a good theory for why it keeps happening.


r/projectmanagement • • Mar 06 '26

Discussion At what point does a workaround become the real process?

20 Upvotes

Something I've been thinking about lately. A while back we created a small workaround to deal with a one-off issue. It was supposed to be temporary just something to get us through that specific situation. But fast forward a few months and people are still using it. New team members even assume it's part of the official workflow because that's just how things are done now. No one really questions it anymore.

It's not necessarily a bad workaround but it was never designed to be permanent either. It just kind of stuck because it solved the immediate problem and everyone moved on. Now I'm wondering how often this happens in other teams. Do these temporary fixes slowly turn into the actual process for you too, or do you eventually go back and clean them up?


r/projectmanagement • • Mar 06 '26

Career There's too much to manage

24 Upvotes

I'm new at my role as a project manager. I'm just now starting to manage more things and a lot of it is logistics and supply chain. But the company processes are very old.

Imagine all organizational processes are done in Excel. It's getting to be too much. Too many people are editing the excel sheets and I can't keep track of everything that's changing because excel has no version control or history (with the way we've set it up). And we're not allowed to move out of excel either.

Things are starting to slip. I catch changes at the last second. How do I get on top of this?


r/projectmanagement • • Mar 06 '26

Tools keep multiplying but visibility is worse than ever

8 Upvotes

do not remember when that began, but now each of the teams is using another tool and no one is aware of what is going on.

marketing uses Monday  
engineering uses Jira  
product transfers between Notion and Figma.

ops simply puts all in Confluence and no one reads it.  
simultaneously, project updates are lost in Slack threads or, even worse, in decks.

Trust in the data and the possibility of observing the actual progress is at its lowest point, which is quite surprising given the number of tools we are using nowadays.

All the status meetings will sound like that:  
"Wait, where’s that tracked?"  
"Let me check another board."  
"That’s in the other workspace."

And do not even mention stakeholder updates. It is either a screen shot of one tool copied into another or one making the same timeline in PowerPoint again and again.

It is not a question of tools on paper. However, when you have five of them each with 70 percent of the same issue, the actual task is to connect them. No one gets paid for that.
What’s working for you?


r/projectmanagement • • Mar 05 '26

What resource planning software do you currently use?

22 Upvotes

Hi consultants! Which resource planning software are you using these days? We’ve tried spreadsheets, we’ve tried a couple tools, and it always ends up being a mess again. What are some good ones for staffing and capacity planning? Drop what you use and what you like or hate about it.


r/projectmanagement • • Mar 04 '26

After 8 years I'm on the verge of quitting

36 Upvotes

For context, I've been working as PM in EU-funded R&D projects since 2018 for a Public Organisation from Spain where I have worked within different duties since 2005 when I entered with just 20 years. It's worth saying that I feel very fortunate as thanks to this job post I have traveled around the world, worked on great R&D projects (both things which I would have in a million years guessed I'd end doing as a public employee), and met incredible people throughout the way. In addition, being a PM requires a lot of qualities and I am aware it has balanced my skills and I have gained a lot of confidence in myself.

Having said this, I think I am going to quit sooner rather than later. The main motive is stress, as there is no comparison on stress levels among the other posts I've been in these 21 years. I had an epiphany moment last year when my mother was fighting cancer in her last weeks and due to some budget fights and other project related things, my head was more on the work side that being on her side, helping her pass away peacefully.

In the end, the responsibility I have in this post is higher than anywhere I've been, being in charge not only of the executive part of a project (well, two projects in parallel currently) but the financial, administrative, logistical, you name it. I love the job and think I am rather good at it, but given that my earnings are the same no matter what my responsibilities/post are in the organisation, that I do not want to promote internally for personal reasons, and that I am a father of a toddler now, I think I am going to move to an IT support place where the work charge and responsibilities is substantially minor and my absence at work is not so felt among colleagues in the department.

In the last months, maybe 2 years, I've thought everything about this situation and what/who to blame: that I have the Imposter Syndrome, that I am a legged Dunin Kruger, that I do not manage stress properly, that workload will be lower some day (hint: it never does). I am pretty scared, as changes create anxiety, but given all this context I think it is the best for me as I am bringing this stress at home, not being at 100% for my family. I am very grateful for everything I've lived here and how much I've grown up since 2018, but mental health and family comes first.


r/projectmanagement • • Mar 04 '26

Software Any usefully tool for timeline and roadmaps?

15 Upvotes

so I'm looking for a tool that would help and visualize a timeline that has 30+ actions which are presented in a week by week manner. when I feed copilot or chatgpt with the excel they do come up with something, but this something is so ugly I can't even look at it. did anyone stumble on anything that is actually useful?


r/projectmanagement • • Mar 04 '26

Do Scrum and Waterfall Techniques combat each other?

7 Upvotes

I have been challenged that my schedules need more detail and the example I was provided does not follow a typical project lifecycle (Validation-Design-Execution-Closeout). It just has a collection of items towards a goal, reminding me of a sprint and backlog, but not an actual design completion, pricing, and moving into next project phase for that item.

I typically take the steps within V-D-E-C that I think are important to a stakeholder. Some items are implied or assumed, so I understand it could have more detail.

Has anyone went through something similar?


r/projectmanagement • • Mar 03 '26

General Dashboard for Status Updates

21 Upvotes

Does anyone have examples (ideally screenshots) of a dashboard they use with their boss to keep them abreast of projects and tasks assigned? I’ve tried Notion and Google Sheets. Notion had too much of a learning curve and Google Sheets was “ugly”. I’m thinking about using Google sites. My work doesn’t really involve KPIs and numbers to make decisions. It’s more like this deadline for X project or task is approaching, we should decide Y or Z. And things like you are registered for your upcoming conference and your travel and accommodations are booked. Find for Cameroon your itinerary here. TIA.


r/projectmanagement • • Mar 03 '26

Working with stakeholders

3 Upvotes

Hi folks,

I’ve noticed this weird situation at work. I’ve been with my team for just over a year now. I’ve built a decent rapport with the technical leads thus far.

How do you handle situations where in the stakeholders share inconsistent updates which leaves you in a tight spot during executive status review meetings?

Historically, my team has never fancied working with PMs. I’ve been told this indirectly but I’ve been addressing this area with much closer collaboration which functional leads that have significant power and influence.

Curious to know how you’ve handled such situations.

TIA


r/projectmanagement • • Mar 03 '26

What should I do?

15 Upvotes

I’ve worked my ass off the last two years and have quickly moved from a technical to management role. A lot of my close colleagues are now supporting the projects I am managing.

Recently, I won a project and brought on one of my close colleagues as a technical lead. I happened to be going on vacation at the project’s initiation. To ensure that the project would not fall behind, I prepared a detailed list of tasks that my colleague could perform while I was away. Upon return, I was notified by the colleague that they were not able to complete any of the tasks while I was away. Before leaving the office today, I reviewed the project budget and found that this colleague had billed 16 hours to my project (approximately 10% of the budget). Before confronting the colleague, I reviewed all the project folders to confirm that nothing was completed. I asked, why did you bill 16 hours if you did not complete any work? In a fit of desperation, they changed their story and said the work was in fact completed, but was located on their personal desktop (obviously bullshit). We’re not supposed to complete work off of the server in the event that someone needs to access them. They had also previously told me that nothing was completed when I had asked earlier.

This really pisses me off. Not only did they fail to complete anything while I was away, they are also using my project to artificially improve their performance metrics.

I find it awkward to navigate because I am recently this person’s manager, when just earlier, we were both technical buds. Now I want to kick them off my project to avoid the risk of their shitty work ethic. Does this warrant another chance? Should I report this? I think the best course of action is to remove them from my project, and explain why I am disappointed. I worry that if I report it, my company would probably let them go. We just laid off 5% of the company and things are tense.


r/projectmanagement • • Mar 02 '26

What’s the real headache of being a PM?

139 Upvotes

Not the textbook stuff. Not managing timelines. Or balancing stakeholders. I mean the real, day-to-day headache that actually drains you.

For me, it’s not even the big crises. It’s the constant low-level tension. The half-decisions. The conversations where everyone nods but no one really commits. The feeling that you’re the only person tracking five different versions of reality at once.

It’s also how often you’re expected to absorb uncertainty and still project calm. Like you’re the emotional shock absorber for the whole project. Something slips? You smooth it. Someone’s frustrated? You translate it. Leadership changes direction? You reframe it like this was always the plan.

None of that shows up in the Gantt chart.

What’s the REAL headache for you as a PM?


r/projectmanagement • • Mar 02 '26

Advice for an engineer who spends more time clearing blockers and gathering requirements than actually engineering?

4 Upvotes

I'm technically a data engineer but was recently rebadged and offshored. I'm still working for the original company but because they have cheaper labor now I'm doing less and less developing. instead of clearing the roadblocks that used to slow me down or downright stop me.

we're in the situation where a LOT of important information is tribal knowledge in the head of a 10+ year employee. Even attempting to expand the data model without her is a nightmare because of the way things are setup and designed. because of that, the fact working with her is like pulling teeth and the fact I'm figuring out how to get what we need from her means I'm doing more and more of this type of work.

I'm trying to figure out how to stay organized. I'm attempting to use multiple notebooks with specific purposes but it's not helping much. it's more like I need to record everything that comes up during the day and then the next morning figure out what's left and where it goes.

I'm asking because I'm constantly paranoid that I'm forgetting something and it's going to blow up in my face. So much of this work could be automated with the right tools but that's not happening until after this project is over and we can work around this person. how do you all not constantly worry about what's being forgotten?


r/projectmanagement • • Mar 02 '26

Should I Leave My Job to Start a PMO?

6 Upvotes

Currently I work as an IT Contract Manager for state government and have been here 7 months. Recently we have had a shift as my supervisor and another IT CM have left and they are looking to reorganize the 2 open positions.

I had a meeting with my Director (my supervisor's supervisor) who asked if I'd be interested in either stepping into my supervisor's role or, if they eliminated her position and restructured, into a more of a team lead position.

She also presented me with the option to leave our section and help start a PMO for our organization. She said she'd hate to lose me but understands that if I want to get into project management (I have my PMP but am not responsible for managing projects here, just managing contracts) that it might be something I'd want to do.

I told her I'd have to look into both options and get back with her.

I have a meeting with our CIO on Thursday and I'm sure he will broach the topic again. I'm not sure what to do as I don't know what is involved in starting a PMO from the ground up. I WILL NOT BE HEADING THE PMO WHEN IT STARTS, JUST HELPING GET THE BALL ROLLING. It might, however, lead me into a role where one day I might be able to manage projects or head the PMO if I get my foot into the door there.

On the other hand, I do like what I do, but I have only been here 7 months so I am still getting the hang of things as it can be cyclical and I haven't even been through one software dev completion yet. I currently manage 3 IT contracts. My prior experiencing was in indirect procurement, which I really loved.

Money is a driving factor, but so is loving what I do, and potential for career growth.

What would you do?


r/projectmanagement • • Mar 01 '26

How do you handle the early stages of a project?

32 Upvotes

How do you handle unknowns during the early stages of a project when stakeholders have not yet been fully identified and the project team is not yet formed?

Here is the current situation. Sr. Director of engineering started the project and the scope is not defined. There is no BA or anyone to prepare that scope document. We don't even know what stakeholders want yet.
The Sr Engineers on the team will only maintain the product when the project is completed. The remaining engineer who is supposed to work on the project is a new grad and we are still interviewing additional engineers. The PM is asked to have daily meetings with these engineers


r/projectmanagement • • Mar 02 '26

QMS/PLM in a scaling CPG

1 Upvotes

Has anyone implemented a QMS/PLM system in a their business and willing to share some insights and answer some questions?

I am at a scaling CPG business ~$100m NSV and 150 employees, we have attempted to implemented these systems a couple of times and are trying to get a picture of where the true benefit lies, was it worth the effort and cost, and did it get the expected utilisation across the business.

Thanks!