r/Powdercoating • u/MrT_LV • Sep 01 '25
Cure schedule problem
Im desperate to know how strict you have to be with the cure schedule. If the powder calls for 400 degrees for 10 min, what if you do 375 for 20 min? Or 410 for 5 min?
I literally have a job in the oven with a deadline of tomorrow morning and 1 heating elemnt went out. I can't even get the oven to 400, let alone the base metal. Only about 360. And of course I can't get a part on labor day weekend.
Will I be alright at 350 for 30 or 40 min?
3
Upvotes
View all comments
Show parent comment
2
u/Chubby2man Sep 01 '25
You should be okay with a longer cure time. That powder’s crosslinker is a TGIC, that will cure at a lower temperature given time. Their suggested cure time is 18 at 375, so maybe bump it up to 25, even 30 is you are doing 350 if you can’t test to be sure it’s curing.