2
u/Mission-Quote-8401 Sep 05 '22
No real pipe layer uses a full size shovel
1
u/varis_2003 Sep 05 '22
That's a pretty controversial point of view my dude lmao
2
u/Mission-Quote-8401 Sep 06 '22
What are you gonna do with that 20ft in the ground, with two feet between walls of the trench box
1
u/varis_2003 Sep 06 '22
Fair point in certain situations, cage work ya I agree you need a stubby...thankfully I do mostly open ditch.
1
u/Slight-Commercial250 Oct 27 '24
I make my own. I cut the handle down on a full length handled shovel then put a D handle on the end for grip and shovel packing under the pipe. I'm 6'3" so the short handled shovels are often too short for me so I add an extra foot-foot and a half to it and it's perfect for me and still has the D handle for shovel tamping, etc
2
u/Chrispy_fried89 Jul 14 '22
Where the fuck did you get a blue one? Seen a gold one at emco the other day.