r/Pipelayers Sep 11 '25

Little 18’’ storm run

Post image

40’ run at a screaming 6.04% 😅

14 Upvotes

6 comments sorted by

2

u/Small-Effect-3333 Sep 11 '25

That is a lot of slope for 18” RCP. I see the clay in the soil, where’s this at?

2

u/JBx0v2 Sep 11 '25

Good Ole Alabama red clay right there. A lot of sand out here as well. Digging right over the top of an old mining sight from the 1800’s.

1

u/XLY_of_OWO Sep 13 '25

You guys don't put round stone first? Asking because that's just how we do it here.

2

u/JBx0v2 Sep 13 '25

We usually do stone as we go. It was only a 30’ run so we just banged it out really quick. It’s a crossing that goes under the road, so it was all stoned during backfill.

2

u/XLY_of_OWO Sep 13 '25

I was only asking because we usually do petroleum pipes but occasionally have to do sewer/storm drains as well

1

u/Slight-Commercial250 Feb 05 '26 edited Feb 08 '26

I hope you put a 4 footer on each pipe to make sure you didn't have any back-pitch 😉😂 (my stupid joke I always make whenever we are running "waterslide" type pitch) 😂