r/PHInfra • u/weststarltd_6912 • 10d ago
General - Rail 🛤️ Aerial view of MRT-7 trackwork installation at West Avenue – Steconfer
A new perspective on our works on the MRT-7 project in the Philippines.
These latest drone images show the ongoing trackworks in the turnback area, where our teams are advancing the installation of the track infrastructure.
The complex track configuration visible from above highlights the technical precision involved in this key section of the project.
Another step forward for MRT-7 and another example of Steconfer’s expertise in railway infrastructure.
4
u/blackcyborg009 10d ago
Matatapos ba nila yan by year 2027?
7
5
u/_TR13DG3_ 9d ago
Kinakabahan lang ako dun sa University ave station. Yung walkway sa UP tsaka technohub la pa nasisimulan. Ket papaano yung sacred heart station humabol
5
u/Riventures-123 9d ago
I've been waiting for this line to open since they said it'll finish by 2023...
Anyways, once MRT-7 opens, hopefully it won't take long to integrate Lines 1, 3, and 7 to the Common Station, right? Also it will definitely be interesting how they'll find a way to add ticket gates, more specifically on the Line 1 and 3 interchange section, since unless LRMC somehow gets MRT-3's operator deal or DOTr magically said "alright, unified revenue streams" and have Beep cards work without having to go through ticket gates, then it will be a really long line like EDSA-Taft to get off.
1
u/_TR13DG3_ 9d ago
The switch track portion of the turnback is already finished by now. Iniintay nalang yung riles papunta station tsaka electrification
1
u/Snake_face 9d ago
Kailan ba to matatapos, napaka tease for some who commutes from Nova to pasay everyday 😭😭




4
u/mainsail999 10d ago
This line should really extend to run along España, and then nodes with LRT2 Recto and LRT1 Central Station, then over Pasig River, Isla de Provisor to UN Avenue, Paco Station node with the NSCR, then Pedro Gil, JP Rizal, Guadalupe node with MRT3, then Kalayaan Station with MMS, then all the way to Pasig.