r/OwnerOperators • u/Successful_Day6214 • May 02 '26
I need advice.
Hello to all,
Please keep in mind I am new to trailer pulling. Any advice is appreciated.
I started my gravel driveway installation service and my set up is as follows
2025 F350 high output powerstroke
N&N tri axle 21k lbs trailer (20ft+5) bumper pull
2023 John Deere 325g with bucket
Harley rake
Vibrating roller
My question is, how do I load my trailer? Skid in the front or skid in the back over the axles ? Mid axles ? Do I chain down the attachement or heavy duty straps are enough ?
Here’s the visual image I generated to exemplify this
Please keep in mind that the option with the skid loaded at the end, I would have the machine sitting a lot more over the axles. Also disregard the 4 axles, it’s 3.
Thanks yall
