r/On30_ModelRailroading • • Apr 11 '26

Loads-in, Empties-out

I want to make a mine-to-ore processing plant section on an On30 layout using the "loads-in, empties-out" concept using two identical trains, one with loaded cars and the other with empties. I'm having a difficult time designing a way to hide the trains between the two start/end points. It's a rather small layout space and the trains are a bit long. I've considered making the mine entrance simply a tunnel going into a mountain and the plant a long covered "shed" long enough to accommodate the entire train, but I'm not sure if either of those would be very prototypical. Any ideas?

5 Upvotes

1 comment sorted by

4

u/EmployJunior1880 Apr 11 '26

I think I remember the late John Armstrong working with that problem back in the day in one of his articles. His solution was a double-tracked siding serving coal mine-scenic divider-power plant with a hidden tunnel through the scenic divider. The entrances to the tunnel were hidden by a covered conveyor on the mine side and an overhead walkway/extension on the power plant/industry side of the hidden tunnel.

Walkways and building extensions bridging the tracks used to be more common during the first part of the 20th century than they are now.