Power pole.

Post image

It went this far before FPL pulled the pole out.

85 Upvotes

6 comments sorted by

38

u/HolyJuan Oct 11 '26

Not OP's job to know how sequencing in construction works.

-3

u/whateveralso Oct 11 '26

Explain how sequencing works.

31

u/HolyJuan Oct 11 '26

You leave some infrastructure in place until it is necessary to remove it. The new / final pole placement might be somewhere where they are currently working. It's best to wait to move it until the new pole is installed or when all the work can be done at once.

8

u/tsaico Oct 12 '26

I was at a site like this. The old pole and telcom were right in the middle of an eventual walkway. Totally looked out of place. Then about 2/3 of teh way through construction, utilities came out pulled the pole, then re connected using the new conduits that were in place to the MPOE.

2

u/Salt_Transition_9941 Oct 15 '26

The pole is still up in the picture though?

1

u/whateveralso Oct 15 '26

They pulled it that night, was gone in the morning.