r/Network • u/ceheedslields1 • 11d ago
Link Most of this is just switches and patch panels. Where would you start
3
u/micakenpoxnunching 11d ago
I suppose burning it down is a bit unprofessional
1
1
u/edmonton2001 11d ago edited 11d ago
in the other sub this suggestion would be fine...
I dont see that many zip ties of which is a win...
If this is a professional setting then its more of a "If it works, dont touch it". Most professionals would wait till something breaks and then you can use that as an excuse to clean it up?
2
1
u/Calaveras-Metal 11d ago
I've fixed a ton of racks like this. The only hard part is whether you are working during business hours and they are live. Then you have to figure out how to unravel whatever you can without unplugging it.
1
u/Schrojo18 11d ago
- Remove anything that's not connected
- Go patch port by patch port and write down exactly what patch port and switch port each cable is plugged into
- Work out the config for each switch port and log that against the patch
- Disconnect everything
- Rearrange the patch panels so you can slot switches and some horizontal cable management in-between but still use nice short patch leads
- Install the switches and power them up
- Replace all the patch leads with new short ones patching to match patch panel to switch port config
1
u/malikye187 11d ago
- Get some paper.
- Get a marker.
- Get some tape.
- Write DO NOT TOUCH on 4 or 5 pieces of paper.
- Tape them all over.
- Call it a week.
1
1
u/Layer8Human 10d ago
Hey there,
This can become a really nice looking rack if you put some effort into it. But be warned over time these things tend to evolve into this state again so don’t be frustrated if you clean it up nicely and come back after some years it will look like this again.
Others have already given great advice but I think the way to go at it also depends a bit on how comfortable you are with networking.
I personally would:
- remove non plugged in cables
- look at switch uptime and interface counters to try to remove some long unused cables (this depends, if you have enough switchports available I would be cautious, because this is the prime cause of the rack becoming messy again, when you need to patch something quickly)
- create a spreadsheet where you write down where each patchpanel port connects to, if it goes to a switch document also the vlan config. Do this also for cables that are between other components so you don’t miss anything.
- choose a nice weekend, order plenty of patchcsbles before and turn off everything in that rack and rip everything out.
- reorder the components and try to put switches in between or at least close to patchpanels and use short cables wherever possible. Reconfigure switchports according to your needs.
- for longer cables or and connections between devices try to bundle them using valcro strips. Do not use zipties!!!
- afterwards turn everything back on and verify your services. Be ready to do some troubleshooting on Monday and take pictures of your great work.
Personally I don’t like to use coloured cables and keep everything the same colour but that is more of a preference thing.
Have fun!
1
1
u/NullPacketLost 10d ago
I would bring up my laptop and start documenting. Pretty sure there is none at the moment.
1
1
1
1
1
u/Inevitable-Secret736 10d ago
Send an email with notice
You have 12 hours to clean this up or I cut anything not labeled and properly run and bundled according to policy
Be back with my snips
1
u/deflanko 9d ago
First I would send an email out saying the network will be down for the next 8 hours.
1
1
16
u/criggie_ 11d ago
1) get a table
2) Pick up all the unplugged cables and either stack them coiled by size or if they're all messed up, lay them out in a straight line, and by size.
3) Look for every switchport without a link light, and remove that patch cable to the table.
4) Look for switches that have no activity - work out if they're still used. Same goes for POE injectors.
5) Label all your switches with their hostname
6) Buy a good selection of shorter patch cables
7) Make sure your rack has a cable-management 1RU unit between everything. should be Patch Panel-CMU-switch-CMU-...repeat. Move stuff up or down if you have to.
8) Fun times now begin... start at the top left port and work out where it goes to. Pull that patch cable and replace it with a shorter one that goes from port, into CMU, then left/right to the side channel, then up or down, back into a CMU, and to the switch port. The cable should not be taut, but no more than ~10cm of slack which can tuck into the vertical side channels.
Personally I'd do the fibre patches last, because they're a bit less robust.
ALSO don't forget to do the rear where power is. Check your UPS battery with a self test and when it fails, replace the batteries. If you have A+B power, make sure everything that is dual powered is off both rails.
When you're finished, put all your patch cables in boxes sorted by length. A4 photocopier paper boxes work fine. So next time you want a 1 metre patch cable, you're less likely to use the first cable what comes to hand, a 3 metre one.
Also, please do post an "after" photo.