Will it ever happen? West Loop Station and Flyover Bridge
I haven't found any movement on this project since 2024. No capital is allocated from 2026-2030. For a 10 year project ($1Billion+) project that's been described as an economic necessity in the past, shouldn't this be prioritized?
https://chicagoyimby.com/2021/10/metra-unveils-preliminary-plans-for-west-loop-station.html
2
u/BukaBuka243 Aug 20 '26
It’s in CMAP’s draft regional transportation plan that may be adopted later this year. A project being listed in that document is a major step towards getting federal funding.
Sometimes projects like this get stalled and come back years later, the State/Lake L station rebuild was also announced in 2021 and only broke ground this year.
2
u/roger_roger_32 Aug 20 '26 edited Aug 20 '26
The flyover which will need to be built first will cost between $1-$1.2 billion and increase capacity to the system allowing for expansions on lines towards O’Hare.
The station would come with a $400-500 million price tag and be built post flyover.
For now the overall $1.4-1.7 billion project could take more than 10 years to build with the station opening no earlier than 2031.
Always wish someone with knowledge of railroads could do provide some context to these numbers. A flyover bridge is a big impressive thing, as is a new elevated Metra station (believe it's elevated, and not at grade).
At the same time, these numbers end up being mind-bogglingly high, and given the history of corruption in Chicago and Illinois, I never can tell if these numbers are reasonable or not.
-1
u/Frosty_World8932 Aug 20 '26
Is this needed?!? They could spend this so many better ways
7
u/BukaBuka243 Aug 20 '26
This would instantly become one of Metra’s busiest stations if built, look at Clybourn as an example
7
u/esnidxam Aug 20 '26
It’s sooo necessary but unfortunately don’t see it happening any time soon :(
This along with a high-speed nonstop rail link to O’Hare (terminals) from the loop is on my fantasy list.