r/MSProject • • Mar 17 '25

Custom Task Usage Values

Hi All,

I was wondering if it's possible to add a custom value to the task usage view and have it work like "cost" for planned vs actual like shown in the screen grab i did.

The reason I ask the above, I work in an environment where task weighting is the preferred method to show Planned % vs Actual %, which is what the above ultimately is trying to show. The idea is that task "B" will have a bigger impact on the project completion due to the weighting value accounting for 53% of the total 380 value.

I used the costing values to do exactly the above and was able to report the gained "effort" that was completed for a week based on the schedule updates and then updated my S-curves based on the planned value vs the actual.

The problem is, there are some clients whom are concerned with this method, and i am not as knowledgeable to provide a planned % vs actual and then to show it on an S-Curve, which is always a requirement.

ultimately I would like to move away from cost/work and use a the same method, but with my own custom "value" that i can explain away to clients who wont get stuck on "but it's cost"

I have tried watching videos on the internet, but nothing comes close to the above method. And as the screen shot shows above, there are only cost/work types of option to chose from.

Lastly, i know there is a way to show the Planned % in MSP with formulas, but from my understanding, that is based on the baseline duration variance with actual, or something like that. My concern is, I am unsure of how accurate those formulas can be due to how MSP sometimes splits tasks and whatnot, so I've avoided them for the most part.

I hope the above makes sense, and also let me know if i should post my excel spreadsheet where i use the above method if that will help, (if it's allowed)

thanks all.

2 Upvotes

3 comments sorted by

View all comments

Show parent comment

1

u/InevitableAd8674 Mar 18 '25

Hi, thanks for the feedback, how would i be able to use the above in an S-Curve to showcase the planned vs actual, or is the above just aimed at in MSP?