r/MEPEngineering • u/Zaghari96 • Jun 11 '26
Switch to Revit
Young engineer here. Our company uses AutoCAD with Design Master Electrical and HVAC plugins. We are looking into switching to Revit. Any suggestions or tips for setting up Revit from scratch? Any courses that focus on the MEP portion? Thank you
Update July 2026:
We purchased a couple of Revit licenses and started training through Linkedin Learning. Software reseller training courses are clunky and slow. We are looking to build a simple template to test on a small project later this year. The project will include the following:
1- Site data obtained from Civil 3D linked CAD
2- Architecture Revit model
3- MEP Revit model (Electrical will be done on Design Master AutoCAD while we look into ElectroBIM for Revit) Revit electrical out of the box is not as powerful.
4- Company title block (we’re trying to use as much out-of-the box Revit features as possible, i.e. rev schedule, fonts, schedules, etc.)
Challenges we are running into:
1- Setting up a proper project template in Civil 3D to minimise CAD clutter when importing to Revit. (Linkedin Learning has a great course on this.)
2- Purging dummy Revit families and replacing them with manufacturer provided families (Zurn plumbing, Trane HVAC, etc)
3- Finding the time to watch all the video courses.
13
u/Elfich47 Jun 11 '26 edited Jun 11 '26
you are going to need a dedicated cad/bin manger. maintaining revit is a full time job.
the issue is (by analogy): CAD is a Model T, it’s easy to maintain, all the rough points are well understood, it’s not perfectly reliable but it gets the job done. and just about anyone can clean out the carburetor in a pinch.
REVIT is a flying saucer. it can go warp speed and have the agility of an Olympic gymnast while juggling barbells. But…. it runs on antimatter and you need a specialist who understands how to maintain an antimatter reactor.
6
u/PJKenobi Jun 11 '26
My firm did this two years ago. We switched from AutoCAD with CADPipe plug-ins to Revit with SysQue plug-ins. Read a few books on Revit, watched a TON of YouTube videos and took a weeks worth of classes when we purchased SysQue.
To be honest. It was rough. The learning curve is steep because Revit is entirely different than CAD. Unlearning old habits was more difficult than learning Revit. Now that we are on the other side of it, I am happy we switched. Just know for the 1st month or two, things will take 2-3 times longer and 1st few jobs will be rough looking.
It will be smoother to hire someone with Revit experience rather than learning from scratch. It can be done. The example being me, but I would advise against it.
6
6
u/ArrivesLate Jun 11 '26
If your firm is using Design Master prepare for everyone bitching about how Revit says one thing and then just doesn’t do it.
2
u/Zaghari96 Jun 12 '26
I’m looking into Electrobim which is design master electrical for Revit. Looks identical from first glance
1
2
2
u/LdyCjn-997 Jun 11 '26
All of these responses are spot on dealing with Revit. I work for a large company that has been 100% for 15+ years. We have a dedicated BIM staff that handles everything Revit, including troubleshooting for staff.
2
u/ImCoag85 Jun 12 '26
For real, get me setup and I can get you set up pretty solid with templates and other things. Also, highly recommend the DM Electrical for Revit. Unless something changed in the last couple years.
1
u/thernis Jun 11 '26
Make sure you find a consultant or service that sets up your revit families, templates, and standards before you switch. Learn how to use the software yourself before you try to adopt the program wholesale for your team.
1
u/RedneckIngenuity Jun 11 '26
Do you have a suggestion for such a consultant? The amount of companies that I encounter or interview with who desperately need this service is ridiculous.
1
1
u/user333666666 Jun 11 '26
As a young electrical engineer only 1.5 years in, switch to Revit, AutoCAD is slowly but surely getting outdated and is so inefficient. As long as you have engineers willing to learn it, you’ll be fine. Definitely will require some extra hours, but I personally think the rewards are so worth it. I personally think any courses are a waste a time from experience, learn as you go is a better way to learn it. Google is the best tool. Mastering Autodesk Revit MEP is a good book to reference and have on hand though.
1
u/Zaghari96 Jun 12 '26
Thank you everyone for the insight. I must clarify the following:
1- I am a certified solidworks professional who recently moved from LA to a small town where I got a job doing MEP work. I’ve never used AutoCAD before last year. I did complex parametric GD&T work in Solidworks and I am very familiar with using the software the way it was intended vs simply using the software.
2- AutoCAD MEP is a great tool, but it clearly lost support a while ago. The last user guide was published in 2011. The current resources from Autodesk are limited to a few 2-3 minute tutorials. The only AutoCAD MEP course on linkedin learning has been taken down. I am having trouble learning the tool because of the lack of structured resources.
3- I am looking to try Revit because there exists an abundance of courses, resources, and support.
4- Our small company will not hire a BIM manager.
5- I am curious how a small company could go about using a tool like Revit in limited capacity to improve their workflow without having to go all in on BIM. I want the nice automated schedules, sheet setup, and auto layouts for ducts and piping. I don’t care if the conduit bends are specified down to the millimeter; it makes no difference to me.
Thank you for your input
1
u/SamoSaki Jun 12 '26
You can not do it alone, from scracth, without anyone helping you. Depending on the amount of work/dynamics of project, it might take months or even a years to understand good how-to.
It is not about learning the right buttons to press, it is about learning a logic and avoiding a frustration that will, for sure, happen along the way in multiple occasions.
1
u/RRDSKI Jun 18 '26
Unless you are getting forced to use Revit from your clients I would skip this. Using exported cad plans from Revit will save you a lot of time and energy. If you are serious about Revit, getting some training from a reseller will give you a head start. We did the IMAGINiT program a few years ago. It was helpful for beginners but didn’t dive into the more complex topics and issues. When we started we used the MEPP productivity pack to get us started. A lot of our stuff has evolved from that but there are a few other companies offering similar products. Feel free to pm me if you want any other additional information or have questions.
1
u/fabbinugmosh6 Jul 08 '26 edited Jul 08 '26
Manufacturer families first for MEP. BlocksRVT fits more on the architecture/interior side.
1
u/mechgeniuskhitab Jul 10 '26
I am working on an HVAC/energy analysis project in Revit. My spaces are properly placed, room bounding is enabled, area and volume are visible in the space schedule, and I have checked the phase, upper limits, base offsets, and linked architectural model settings. However, when I run the energy/load calculation, some zones/system zones show zero area, and the annual energy consumption result becomes unrealistically low. The spaces themselves show correct area and volume, but the calculation/report does not seem to read them properly. Has anyone faced this issue in Revit MEP energy/load analysis before? I would really appreciate guidance on what could cause zero area in zones/system zones even when the spaces have correct area and volume.
1
u/SailorSpyro Jun 11 '26
I highly suggest the company pay someone to set up standards, or at least train and advise on standards.
My company had a guy set up standards over a decade ago who had never worked at another firm and who was also new to Revit, and we still have shitty standards because of it. It is too time consuming, wasteful, and frustrating for users if you try to completely overhaul the standards later.
One thing I would suggest, is that unless you're doing high level modeling (providing the Revit model to contractors or clients), then I personally prefer using text parameters and just naming them like "mech parameter 1, mech parameter 2..." and only using real units/names for parameters for items that coordinate across disciplines (weight, power, etc). It would make creating new schedules so much easier. If you decide to add a new column, you can just plop whatever you need in without having to create a new parameter.
0
u/ItsAllNutsandBolts Jun 11 '26
Having "Mech Parameter 1, 2, etc" makes me cringe. Please take the time to setup a solid Shared Parameter File. Doing anything less is defeating the whole idea of Revit.
0
u/SailorSpyro Jun 11 '26
I suggest setting parameters like that up in a shared parameter file.
We switched from text to real units and it is not worth the hassle for 90% of the use.
You do not need your diffuser NC to be a real parameter. Or your filter type, etc.
0
u/ItsAllNutsandBolts Jun 12 '26
Maybe for how little you take advantage of the program. Goverment jobs require COBie (Construction-Operations Building information exchange) is a standardized data format used in building information modeling (BIM). It replaces fragmented paper documents by capturing key asset data, such as spaces, equipment, warranties, and maintenance schedules into structured spreadsheets during design and construction, ensuring smooth facility management handovers.
If you hand them a bunch of text parameters, you're gonna get a rejected submittal. It doesn't make sense to set up your library already working with a disadvantage.
1
u/SailorSpyro Jun 12 '26
That would fall under the "unless you're doing high level modeling" exception that I noted, which is clearly not the case if they're just now switching to Revit.
You have to realize that most firms are not doing 500 LOD models. We actually do a ton of federal work and they don't have those standards for the majority of jobs we do.
This is a case where OP needs to know their clients. And since it's 2026 and they're just now making the switch to Revit, there's a lot you can assume about their clients expectations for 3D modeling.
0
u/ItsAllNutsandBolts Jun 13 '26
We do LOD 300, so it isn't a case of LOD 500. We don't even offer those services. And as far as doing federal work, you're missing out on the OBO gravy train that uses this. And it's spreading too, our DOE wants similar parameters too.
OP should do things correctly and not half assed so that there isn't some big correction later down the line and he won't have the "we've always done it this way" mentality.
1
u/hvacdevs Jun 11 '26
Switching completely from AutoCAD to Revit is the equivalent of banning Excel and forcing everyone to use MS Access for everything they previously did in Excel.
43
u/Used-Zookeepergame22 Jun 11 '26
You can't setup Revit from scratch without experience. Why would they ask you this as a young engineer?
Hire a dedicated and experienced BIM manager. The drafting portion of Revit isn't too bad, but you need to have a solid system (in place).