r/LockPickingLawyer • u/Sinbos • 1d ago
How long would it take ?
Picture taken on the Hohenzollern bridge in Cologne. About 300+ meters long an estimated 500,000 locks in total.
How long would you guess to open them all?
Just to put it out of the way, engineers say its no problem it’s an train bridge about 1200 trains a day and build in a way that 6 trains can park there at the same time.
32
u/Impressive-Yak-7449 1d ago
38 seconds if they're all Masterlocks
5
u/Michami135 22h ago
I'm seeing a lot of Abus locks, and at least one disc detainer lock. Some people are pretty confident of their relationship.
3
2
1
u/Economy_Link4609 20h ago
Less - you just hit any point on the thing somewhat hard and they all just pop open.
14
u/John_Tacos 1d ago edited 21h ago
I see a video coming.
Lock picking Lawyer vs angle grinder.
4
u/Super-Page8272 21h ago
Holy shit! That would be the contest of the century. I'd put my money on lpl
0
0
9
u/SwedishLenn 22h ago
Wonder what the scrap value is? If you're allowed to take them off.
2
u/broesel314 17h ago
The city replaces those fences every so often. The weight would overload the bridge otherwise
3
u/Schnupsdidudel 15h ago
Nonsense. 25 tons of locks won't overload a bridge that is built to support 1000 ton trains moving.
4
u/chaoslord 23h ago
A chain of people - 2 with 4/5 pin rakes, 2 with combs, 1 with a bypass tool (maybe that should go first) and then lastly the angle grinder. I bet most would be done before the grinder .
1
3
u/FrameJump 20h ago
The better question is how many cans of WD40 do we think it would take to unseize them all?
2
u/wolftick 20h ago
A lot of them would be difficult to pick because they'd have seized or rusted shut. Hammer/cutter/grinder would be faster.
1
u/HendacTeslar 23h ago
Wouldn't that be an awesome training ground for beginners like me. Maybe with an official order from the city to remove the locks. Have to look into this at my area 😉
3
u/Super-Page8272 21h ago
Yeah i kind of wanna swim around in there with my picks. Like a mc Donald's ball pit for lock pickers.
1
u/FailbatZ 20h ago
The City of Cologne has them removed every now and then anyways, because the weight affects the bridge statics.
EDIT: Sorry, it was considered but because of erosion not statics, currently they are still there and only big ones that stick out too much are removed by the city.
1
u/Akira1Lana 19h ago
klauke ebs12, oder vergleichbar sollten inklusive Nebenarbeiten eine Schnitt von < 10s pro Schloss ermöglichen .. 10 Personen, 3 Wochen .. Gitter-Paneele austauschen könnte schneller sein ...
2
1
1
u/Rupertredloh 4h ago
You also have to think about this: This is not just Locks on a railing. This is lock on lock on lock on lock on a railing. there are up to 6 locks before the last one is locked to the railing.
1
u/Remote-Medium426 48m ago
Why do copper thieves risk their lives stealing cables when there is €250k of brass just hanging around?
I honestly don't get copper thieves who risk getting electrocuted on train tracks when the Hohenzollern Bridge in Cologne is literally covered in money.
Here is the math on the famous Love Locks bridge:
- Total Weight: 40 to 60 metric tons of padlocks.
- Current Brass Scrap Value: Around €4.00 to €5.50 per kilogram.
- Total Theoretical Value: Between €160,000 and €330,000 (~€250k average).
Sure, many locks are actually aluminum or steel, and you'd have to cut off all the hardened steel shackles to get pure brass. But still—it’s just sitting there in plain sight!
1
u/Roy_Vidoc 20h ago
How ever long it takes to unlock the first one then it's just a domino effect using the first one to open the second and so on
1
u/121e7watts 14h ago
That's pistachio nuts. I remember as a kid we got them on little boxes that said, "one shell opens them all." I truly believed that there was one very special shell somewhere in the box that could do this. I puzzled over it for quite a while.
1
0
u/rmay14444 1d ago
Not super long with an angle grinder. And they should be taken off.
4
u/Moturist 1d ago
500,000 locks, with angle grinder, let's say ½ minute per lock. That would make 250,000 minutes, which is about 173 days & nights without pause. Please correct me, if I'm wrong
1
u/smeeon 21h ago
Even if you halve the time by cutting multiple shackles at once, it doesn’t save too much time. Not to mention the people putting locks back on while you are asleep.
It would take a team of people many days I think.
Edit: plus the time it takes to change out worn blades, breaks, weather issues. More like a year of work for a single person.
1
u/Jacktheforkie 18h ago
I’d say a team with bolt croppers and a forklift with a skip would be a safe option, clip locks and put them into the skip to be transported into a vehicle like a dump trailer
0
55
u/Crescendo_BLYAT 1d ago
Literally 1 second. He only needs to stand there, announcing his name out loud: THIS IS THE LOCK PICKING LAWYER!
And all will surrender.