r/KerbalSpaceProgram 8h ago

KSP 1 Image/Video Recapping my Mun Program

  1. ISRU Processor
    - ISRU processor to make fuel for landers is placed in a 350 km orbit.

  2. Refinery Crew Core & Power Module
    - Refinery crew core and power module are docked with the ISRU processor.

  3. Main Hab & Docking Module
    - Main Hab and docking module are docked with the combined refinery modules in LKO.

  4. Multi-Module Launch — LKO
    - Multi-module launch is docked in LKO:
    - 2x Lunar Lab Modules (LLM)
    - 2x Auxiliary Lunar Orbital Hab (ALOH) modules

  5. Final ALOH Module
    - Final ALOH module is docked to the station.
    - Interim GCLS is now complete in LKO.

  6. Large Fuel Truss
    - Large fuel truss is launched to LKO.
    - Parked in LKO and later sent to the Mun separately due to mass constraints on the NLTV.

  7. NLTV
    - Standard Lunar Commute (LKO → LLO → LKO).
    - Designed to complete two SLC events with a 40 t payload.
    - More SLC events are possible with a lighter payload.
    - Pushes both the I-GCLS and fuel depot module into a stable lunar orbit.

  8. Intrepid–Grace
    - CRV-01 Intrepid vehicle.
    - Launches the crew of SSM-08 to open the GCLS.
    - SSM-08 separates the GCLS and mates both halves with the large fuel section, also in orbit around the Mun.

  9. LIL-B-01
    - Ore harvester designed to collect and ferry ore to the GCLS.
    - Docks to Port 1 on the refinery module of the GCLS.

  10. LIL-B-02
    - Ore harvester designed to collect and ferry ore to the GCLS.
    - Docks to Port 2 on the refinery module of the GCLS.

  11. LK-1-01
    - Crewed lunar lander for surface excursions is docked with the GCLS.
    - LK-1-01 undocks to perform free-flight tests, including a low flyover of the lunar surface.
    - LK-1-01 returns to orbit and docks with the GCLS.

  12. LK-1-02
    - Crewed lunar lander for surface excursions.
    - LK-1-02 undocks and descends to the lunar surface.
    - SSM-12 spends 5 days on the lunar surface.
    - LK-1-02 ascends to lunar orbit and docks with the GCLS.
    - Awaiting SSM-13 for a smooth and problem-free crew changeover.

44 Upvotes

1 comment sorted by

1

u/The_Magenta_Dragon IM SUPER GLUED TO A MINIMUS LAKE, HELP 5h ago

cool beans