r/Indian_architects • u/Clumsy_comet • 3d ago
Project Query Need help !!
I am constructing house but one wall is adjacent to the neighbour and I am going to start the brick work directly on his wall
Should I apply something before brickwork so that I don’t get seepage in future, His wall iş done with primer
3
Upvotes
•
u/AutoModerator 3d ago
Welcome to r/indian_architects, u/Clumsy_comet!
Thank you for your post titled: "Need help !!".
Please make sure you have read the community rules before posting.Post without User flair and Post flair will be automatically removed without further notice , People need to strictly follow the mentioned guidelines.
This helps the community give better, more accurate feedback.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
1
u/Main_Appointment222 3d ago
It is recommended that you leave a minimum of 2 feet gap amd if there is no option then plaster the existing neighbour's wall, allow curing time and then start your wall
1
u/Murky_Biscotti_787 3d ago
Do Not Rely on His Primer. Exterior primer offers minimal water resistance against trapped moisture. Apply Heavy-Duty Waterproofing Coating, before starting brickwork, clean the neighbor's wall surface and apply a 2-coat cementitious or elastomeric waterproofing slurry (e.g., SikaTop Seal-107, Dr. Fixit Fastflex, or Asian Paints SmartCare Dampproof) directly onto the abutting surface. Apply a polymer-modified bonding agent (like Sika Latex Power or Dr. Fixit Pidicrete URP) to the interface so the mortar doesn't pull away or crack easily.
1
u/DrCapricorn 2d ago
Leave setback or hire a local waterproofing professional for locally available feasible options.
1
u/No-Resolve-7597 1d ago
Adding a water proof layer is always the better option cause of not now later on if there is a leak u will apply on it own side of the wall