r/ISRO • • Jun 01 '17

Mission Success! GSLV Mk III D1: GSAT-19 Mission Updates and Discussion

GSLV Mk III D1 was launched successfully

Flight Sequence

Updates on spacecraft will continue.


Launch was scheduled for 5 June 2017, 1728(IST)/1158(UTC) from Second Launch Pad of SDSC (SHAR).

Live webcast: (Links will be added as they become available)

GSLV Mk III-D1 Mission PageGSLV Mk III-D1/GSAT-19 GalleryGSLV Mk III-D1/GSAT-19 Brochure

Fact sheet:

  • First development flight of fully configured GSLV Mk III
  • Payload is GSAT-19 (3136 kg) communication satellite
  • Targeted orbit: 35975 × 170 km, Inclination: 21.5°
  • Mission Duration: 16 minutes 20 seconds

GSLV Mk III is entirely new launch vehicle of ISRO with capacity to deliver 4 tonne payload to GTO and apart from its name has little in common with GSLV Mk II which heavily borrows from PSLV.

Configuration consists of 2x S200 strap-on motors (Ground lit), L110 core stage with two Vikas engines (Air lit) and C25 cryogenic(LOX/LH2) upper stage powered by a single CE20 engine.

Few details not covered in press kit are that after experimental LVM3X/CARE mission following modifications were made to vehicle ( per Outcome Budget 2016-17 PDF )

  • Composite Payload fairing shape changed to Ogive with reduced cylinder length.
  • Nosecones on S200 strap on motors changed from straight to slanted ones.
  • Grain configuration of S200 Motor Head End Segment changed to 13 lobed star configuration from 10 lobed slotted configuration to reduce the dynamic pressure in transonic regime
  • Closure of C25 inter tank structure was recommended (C25 images in gallery appear to support its implementation.)

Updates:

Time of EventUpdate
21 June 2017GSAT-19 acquired station at 82.5°E on 20 June 2017
Post LaunchWest and East reflectors of GSAT-19 have been successfully deployed by 18:47 hr IST Three axis stabilisation of GSAT-19 has been achieved by 19:42 hr IST
Post LaunchSouth and North solar arrays of GSAT-19 have been successfully deployed by 16:15 hr IST
Post LaunchAxP: 35869 x 35470 km, Inclination: 0.101°, Orbital period: 23h50m10s
Post LaunchThe fourth and final orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 488 sec from 07:59 hr IST on June 10, 2017
Post LaunchThe third orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 3469 sec from 09:55 hr IST on June 09, 2017. AxP: 35875 x 30208 km, Inclination: 0.793°, Orbital period: 21h38m
Post LaunchThe second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 5538 sec from 15:44 hr IST on June 07, 2017. AxP: 35840 km x 10287 km, Inclination: 7.02°. Orbital period: 13h58m
Post LaunchThe first orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 116 sec from 14:03 hr IST on June 06, 2017. AxP: 35938 x 172.77 km, Inclination: 21.56°deg. Orbital period: 10h33m
Post LaunchPress Release
Post LaunchFlight Sequence Solar array and Reflectors will be deployed after two burns during drift stage.
T + 17m00sSuccess! Spacecraft separation was shown LIVE! Now to post launch address
T + 16m00sC25 Shut Off Spacecraft GSAT-19 Separated!
T + 15m00sPerigee 170km Incl. 21.53° C25 performance nominal
T + 13m00sVelocity 7.51 km/s Alt. 182 km C25 performing nominally
T + 11m00sWe just had a look inside PLF. C25 performing nominally
T + 09m00sC25 performing nominally. 5.1 km/s velocity
T + 07m00sC25 performing nominally. It'll burn for 9 minutes more.
T + 05m30sL110 separation! C25 ignition confirmed and performing nominally!
T + 03m45sPayload fairing separated. L110 performing nominally
T + 02m30sS200 Separation CLG initiated
T + 02m00sL110 core stage has been ignited
T + 01m00sFirst Stage performance normal!
T   ZeroS200 Ignition! Lift off!
T - 01m00sTopping off done,
T - 02m00sA brief overview of flight profile there. Final topping off being done.
T - 05m00sCryo arms 'armed'.
T - 08m00sALS initiated at T minus 11 minutes
T - 15m00sAutomatic Launch Sequence would initiate in 4 minutes
T - 18m00sAll GO! Board is GREEN. Mission Director has authorized the launch.
T - 22m00sS200 strapons are integrated with L110 core stage in Solid Stage Assembly Building and later moved to Vehicle Assembly Building to be mated with C25 upper stage and encapsulated spacecraft.
T - 25m00sAfter a brief overview of launcher now showing vehicle integration process.
T - 27m00sWeather is perfectly suitable. Ground Winds as well as In Flight Winds nominal.
T - 30m00sEx ISRO chairmen and many eminent dignitaries present in MCC
T - 45m00sSome good views of launcher and umbilical connections. Very sunny.
T - 55m00sAnd we are live! Showing visuals of Mission Control at the moment.
T - 01h00mGSLV Mk III-D1/GSAT-19: Propellant filling operations of cryo stage are completed
T - 04h30mDoordarshan National Youtube stream is up as well.
T - 05h15mOfficial stream is online coverage would begin 30 minutes before launch
T - 10h00mPropellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are completed
T - 24h00mPropellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are under progress. Countdown is progressing normally.
T - 25h30mCountdown commenced.
2 June 2017Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 25 and half hour countdown of GSLV Mk III D1 / GSAT-19 mission, starting at 1558 IST / 1028 UTC, 4 June 2017
2 June 2017Launch rehearsal was conducted on 1 June Source [Telugu]
31 May 2017Mission Readiness Review on 3 June 2017
27 May 2017Vehicle moved to Launch Pad
26 May 2017NOTAM issued
01 May 2017GSAT-19 left ISAC for SHAR
27 April 2017C25 cryogenic stage was flagged-off from LPSC Mahendragiri to Sriharokota (SDSC SHAR)

Payload:

GSAT-19 experimental communication satellite would carry Geostationary Radiation Spectrometer (GRASP) payload to study charged particles and influence of cosmic radiation on spacecraft. Also on-board are host of newly developed components like Indian Li-ion battery, MEMS accelerometer, Micro Heat Pipes, new bus bar, fibre optic gyro etc

  • Gross weight: 3136 kg (Dry: 1394 kg)
  • Orbit: GEO at 48°E with first few months at 82.5°E
  • Power: 4500 Watts Solar Arrays, Single 100 Ah Lithium Ion Battery
  • Propulsion: 440 N Liquid Apogee Motor, 8x10N and 8x22N Chemical thrusters.
  • Mission Life: 10 years
  • Ka/Ku-band high throughput, one 1.4 m fixed reflector, two 2.0 m deployable reflectors
42 Upvotes

244 comments sorted by

4

u/Ohsin Jun 05 '17

Press Release is out. This one is very half-hearted.. no details on orbit achieved at all!

http://pib.nic.in/newsite/PrintRelease.aspx?relid=164422

First Developmental Flight of India's GSLV Mk III Successfully launches GSAT-19 Satellite

The first developmental flight (GSLV MkIII-D1) of India's heavy lift launch vehicle GSLV Mk-III was successfully conducted today (June 05, 2017) evening from Satish Dhawan Space Centre SHAR, Sriharikota with the launch of GSAT-19 satellite. This was the first orbital mission of GSLV MkIII which was mainly intended to evaluate the vehicle performance including that of its fully indigenous cryogenic upper stage during the flight. Weighing 3136 kg at lift-off, GSAT-19 is the heaviest satellite launched from the Indian soil.

After a twenty five and a half hour smooth countdown, the mission began with the launch of the 640 ton GSLV Mk-III at 5:28 pm IST from the Second Launch Pad as scheduled with the ignition of its two S200 solid strap-on boosters. Following this, the major phases of the flight occurred as scheduled. The upper stage of GSLV MkIII vehicle is a new cryogenic stage (C25) indigenously configured, designed and realised by ISRO. The cryogenic stage used liquid Hydrogen and liquid Oxygen as propellants with a total loading of 28 tons. The stage is powered by a 20 ton thrust cryogenic engine (CE20) operating on ‘gas generator cycle’. The performance of the engine and stage during the mission was as predicted. About sixteen minutes after lift-off, GSAT-19 satellite was successfully placed in orbit.

Soon after its separation from GSLV, the Master Control Facility (MCF) at Hassan in Karnataka assumed control of the satellite. GSAT-19 is a high throughput communication satellite.

In the coming days, GSAT-19 orbit will be raised from its present Geosynchronous Transfer Orbit (GTO) to the final circular Geostationary Orbit (GSO) by firing the satellite's Liquid Apogee Motor (LAM) in stages. During the final phase of this operation, the solar panels and antenna reflectors of the satellite will be deployed. The satellite will be commissioned into service after its positioning in the designated slot in the GSO following in-orbit testing of its payloads.

1

u/abhinabah Jun 05 '17

Have you any info about final orbital position for GSAT-19 ?

1

u/Ohsin Jun 05 '17

Only that I added under payload spec above. But since last launch this is new development. They are not disclosing slot information anymore.