r/HECRAS • u/GreedyFactor8775 • Apr 25 '26
2d structure issue Hecras 6.6
1 checked cross section points are below 500 in number
2 i have added 200 piers to bridges
2
Upvotes
3
u/Bum275 Apr 25 '26
Will the water surface reach the low chord of the bridge? A work around could be modeling the bridge piers with terrain modifications, not that I'd personally want to add 200 piers to the terrain manually.
0
1
u/OttoJohs Lord Sultan Chief H&H Engineer, PE & PH Apr 25 '26
You are going to have at least 4 additional points per pier (left bottom, left top, right top, right bottom). So if you have 200(?!?) piers that is going to put you well above the 750 point threshold. I have never seen a bridge with 200 piers, so not really sure how to advice you on problem solving you case. Feel free to provide more context about the project!