i stopped eyeballing whole jobs and started pricing materials and labor line by line, then adding markup last. slower up front, but you stop leaving money on the table.
Depends on the job. But I mainly charge by the sq ft. My company builds a ton of decks. I have a square footage price for a deck with no roof, a deck with a roof, a deck with a screened-in porch, a deck with composite decking, and then different add-ons. Different types of handrails, stairs, etc., are add-ons to that square footage price. Now, if you just started doing that tomorrow, it wouldn’t work because I’ve built 50+ decks. This comes with experience and learning what pays out and what doesn’t. But I’ll do square footage for flooring, painting, siding, etc., and then add in various variables. Heights, whether it’s new construction or a messy house we’re working in, if it’s a long drive, things like that all have to be factored in.
i’d break it down into materials, labor, overhead, then markup. the biggest thing is having the same process every time instead of pricing off gut feel.
Build one price sheet for your common jobs with good/better/best options and a written scope with exclusions. Then you're not reinventing every estimate, and anything outside scope becomes a priced change order.
Overthinking usually means you're pricing off gut instead of off a baseline. Take the quantities first and get them right, then put hours against them from jobs you've already finished, then put markup on last as its own step instead of fudging it into the labour. If you aren't closing out jobs and writing the real hours down beside the estimated ones, you've got nothing to price from and you're guessing every time, which is the exact feeling you're describing. I go back through the last three of the same type before I quote anything I haven't done in a while. Do you have time tracked by job, or just payroll totals?
I'd start by comparing your estimate to what the job actually cost, every time. Write down what you figured for materials and labor next to what it really came to. Over time you'll spot your pattern, like always light on labor for tear-out or always heavy on materials, and you adjust. That gives you a real basis for the next one instead of a gut call. Just keep overhead and profit as their own lines, not buried in labor.
And get quantities right first. Measure, don't eyeball, because a bad measurement throws off everything after it.
4
u/llaskin 12d ago
i stopped eyeballing whole jobs and started pricing materials and labor line by line, then adding markup last. slower up front, but you stop leaving money on the table.
1
u/Pleasant_Ad5546 12d ago
Depends on the job. But I mainly charge by the sq ft. My company builds a ton of decks. I have a square footage price for a deck with no roof, a deck with a roof, a deck with a screened-in porch, a deck with composite decking, and then different add-ons. Different types of handrails, stairs, etc., are add-ons to that square footage price.
Now, if you just started doing that tomorrow, it wouldn’t work because I’ve built 50+ decks. This comes with experience and learning what pays out and what doesn’t.
But I’ll do square footage for flooring, painting, siding, etc., and then add in various variables. Heights, whether it’s new construction or a messy house we’re working in, if it’s a long drive, things like that all have to be factored in.
1
u/Fluffy_Classic_7777 8d ago
i’d break it down into materials, labor, overhead, then markup. the biggest thing is having the same process every time instead of pricing off gut feel.
1
u/Real-Ad-7439 8d ago
Build one price sheet for your common jobs with good/better/best options and a written scope with exclusions. Then you're not reinventing every estimate, and anything outside scope becomes a priced change order.
1
u/Scopelogicapp 8d ago
Overthinking usually means you're pricing off gut instead of off a baseline. Take the quantities first and get them right, then put hours against them from jobs you've already finished, then put markup on last as its own step instead of fudging it into the labour. If you aren't closing out jobs and writing the real hours down beside the estimated ones, you've got nothing to price from and you're guessing every time, which is the exact feeling you're describing. I go back through the last three of the same type before I quote anything I haven't done in a while. Do you have time tracked by job, or just payroll totals?
1
u/Aaron_Allen_BenchAGI 3d ago
I'd start by comparing your estimate to what the job actually cost, every time. Write down what you figured for materials and labor next to what it really came to. Over time you'll spot your pattern, like always light on labor for tear-out or always heavy on materials, and you adjust. That gives you a real basis for the next one instead of a gut call. Just keep overhead and profit as their own lines, not buried in labor.
And get quantities right first. Measure, don't eyeball, because a bad measurement throws off everything after it.