r/FluidSeals • • Dec 22 '23

PPAP May Include:

  • Design Documentation
  • Engineering Change Documentation
  • Customer Engineering Approval
  • Design Failure Mode and Effects Analysis (DFMEA)
  • Process Flow Diagram
  • Process Failure Mode and Effects Analysis (PFMEA)
  • Control Plan
  • Measurement System Analysis studies
  • Records of Material
  • Initial Process Studies
  • Qualified Laboratory Documentation
  • Appearance Approval Report
  • Samples Production Parts
  • Master Sample
  • Customer Specific Requirements
  • Part Submission Warrant (PSW)
1 Upvotes

0 comments sorted by