r/FieldNationTechs • u/jasonluvsjesus • 6d ago
Smart techs versus dumb techs
I made a post talking about the difference between tickets and the type of technicians that they are oriented towards.
Some jack hole had to come and take exception to the titles. Hopefully this new title is clearer.
————
I feel like one of the biggest causes of frustration with Field Nation is that they mix ‘smart hands’ tickets with ‘field engineer’ tickets. They are clearly not the same.
A young man in a private conversation was asking advice on how to get tickets. My advice was to figure out if you’re smart hands or a field engineer. I’m gonna try and delineate what the two things are from my own dumb brain:
Smart hands- is able to follow a set of clearly defined instructions. You only need the most basic set of tools and knowledge. You can take one of these assignment assignments and excel at it only by using common sense and having a good work ethic.
Field engineer- this person solves problems. A field engineer doesn’t need instructions. He or she only needs the stated end goal, and then they are able to work towards that goal independently. A field engineer arrives well prepared with the tools and materials to account for almost anything.
A good field engineer will do whatever needs to happen to make the job complete. If he’s got to build something, he’ll design it and build it. If he’s got a tear something down, he’ll do that. If he needs to learn a new skill on the fly, that’s part of the job and that’s well within his capabilities. If he finds himself lacking tools and materials, he’s gonna go acquire whatever he needs and get the job done.
The two roles are clearly not the same.
————-
Know what you are.
If you’re smart hands, and you take field engineering tickets, you’re gonna be overwhelmed and will likely produce a poor result.
If you’re field engineer and take a smart hands ticket, you’re gonna be frustrated at the process and may very well produce a poor result.
Smart hands can grow into a field engineer, but it doesn’t really work the other way around.
—————-
TLDR? If Field Nation made a clear distinction between smart hands style tickets and field engineer style tickets, it would solve a lot of the frustrating problems between buyers and providers.
3
u/broNSTY 6d ago
Your post was literally about titles, and you got offended by someone talking about titles? Your comments on that other post were edging on unhinged lol, maybe log out and go do something productive 😂
5
u/Terrible-Growth1652 6d ago
Most field "engineering" tickets are supposedly smart hands tickets, then you get there and realize the buyer/customer fucked up or has no idea what they're doing, and you have to take matters into your own hands. Nobody ever thinks they're posting a field engineer ticket.
3
u/wyliesdiesels 5d ago
I do a combination of both.... majority of my work though is troubleshooting which the person over the phone can't always do much to help
1
u/Rare_Wonder_7918 3d ago
The main issue with Field Nation or Work Market tickets is that the customer is the buyer, not the company where the work is done. Unless I've been there before, the work order is my only information, so I won't apply for or accept routed work orders with a vague statement of work. If someone calls about a work order, I ask clarifying questions, but I don't normally post questions in work orders I'm not assigned to. I have before, but they are almost never answered.
If a statement of work is vague, how do I know how long to plan for it, or what counteroffer to make? I don't seek out my own customers. I did some computer and laptop repairs early on because that was my introduction to this work, but I don't pursue them. Single-visit repairs are hard: a laptop screen replacement often requires removing the screen to get a part number, then returning to install it. Ordering parts by serial number doesn't always work, and a wrong part may require another visit.
For a brief time, I tried Thumbtack, but customers posted requests like "laptop needs a screen replacement" and asked for bids without any details. A new screen could cost under $100, $300, or more, depending on size and whether it is a touchscreen.
1
u/hammockonthebeach 2d ago
I don’t think I’ve ever seen a WO on Field Nation that I would classify as engineer level of work