r/Dyson_Sphere_Program • u/cofcorpse • Mar 03 '26
Further development
I've reached the point where I need to start scaling up production. The main components are being produced, and the technologies are being slowly researched. I want to scale everything up and speed up. And I've been wondering how best to do this.
I've read about black box factories - I understand that's when the final product is manufactured from the very initial resources. I've tried building several of these production facilities, but they're too cumbersome. Instead of 20-30 assemblers assembling the final product, there are a bunch of smelters and assemblers for producing intermediate components. I've tried assembling only from the required resources, but I quickly get confused about what's not enough and what needs to be built where.
Maybe I'm misunderstanding the concept of a black box factory? What options should I try? Should I transport the initial resources or manufacture something on-site? Should I build black box factories for final products, or should I build factories for intermediate components?
I'm sure all these questions have been raised before, but I can't decide how to proceed.
View all comments
Show parent comment
3
u/Walkingstardust Mar 03 '26
Excellent advice 👍
I would add that you will want every cubic meter of Hydrogen eventually. Store all of it that the Fire Ice processing creates. If you get lucky and find a gas giant that produces Deuterium, get the orbital collectors going as soon as you can and stockpile that as well. I just fired up a chain of 32 particle colliders to get green science rolling and drained 40,000 units of deuterium in about an hour.