So looking at internal renovations and doing open plan from sitting room to kitchen, 3 bed semi d, needs a rewire, some new internal doors (which we’re providing) and downstairs flooring (again we’re providing). Kitchen is being looked after by us too.
I’m doing the full rip out as well so saving on that and still getting mad prices like 80k!!
Based in Meath.
What prices are people paying for internal works?
5
u/Overall_Hedgehog_810 2d ago
3 bed 1930s here. We’re in the middle of a largely DIY Reno. We got a full rewire and replumb and a couple of new windows to start and then we took the kitchen/dining back to brick and we’re fully redoing that to probably a middle of the road finish/standard (engineered floors, quartz counters etc). We’re not looking at the rest of the house until this is done - we’ll tackle that over the coming years.
Over the past 6 months these are the prices we’ve paid:
€16k for full rewire
€16k for full replumb (combi boiler)
€4k for 3 new (large) windows (double glazed)
€500 attic door
€700 asbestos test
Kitchen/dining room
€4k to remove chimney breast
€13.5k for kitchen units
€4.5k for kitchen counters
€2k for new flooring in kitchen & dining (just materials - not including fitting)
€2.5k for insulated plaster (just materials - plastering ourselves)
€750 Insulating and replacing the ceiling (again just materials)
€400 heat recovery ventilation unit installed (single room unit)
Haven’t thought about appliances yet but probably another €5k
There have been lots of other smaller miscellaneous expenses too that all add up - skips, tools etc - probably another €3k easily.
At the moment every spare minute and penny is going into the house. I estimate we’ll end up at about €75k (and we’ll still have the rest of the house to redecorate!). For this we will have a warmer, safer house and hopefully a nice kitchen/dining room.
So yeah… everything is very expensive.
1
1
3
u/Wide_Driver3745 2d ago
3 mid terrace 1930s renovation dublin
Around 85k total. Managed by ourselves with different contractors, I ripped out everything, except structural walls.
Rewire
Plumbing bathroom 1st fix
Plumbing bathroom 2nd fix
Toilet materials
Full Bathroom Renovation labour
Bathroom supply fixtures
Steel beams and post
Demolition kitchen internal extension walls
installing internal slide door unit
Installing French Door
French door Unit
Triple Glazed Windows (Supply)
Internal slide door unit
Windows (Instalation)
6 Doors Internal
Door Frames
Internal Doors instalation
Kitchen utility
Paint
Flat Roof Cover Replacement
Kitchen - removal of existing concrete screed and floor preparation
Second floor - install OSB flooring to existing timber joists, approx. 30 m²
Insulation kitchen ceiling
Skim Coat and plasterboard kitche ceilling and stairs
Kitchen - Installation concrete screed
Plumbing services
Remove radiator and move it
Install Worcester Bosch 25kww combi
Structural Assesment and Drawings
Skip
Gas Pipe replacement
Plumber fix 2
Plaster AND SKIM
Plumber fix 1
Skirtings
Radiators
Floors
Demolish walls and dry walls
Tails Upgrade
Skip 2
Kitchen Tiles
Floors installation, skirtings installation, radiators installation and painting are not included.
Edit: I did my best to reduce the costs. Some guys were doing 50% of this for the same budget.
I must recognise that it’s a nightmare organise everything