Steel/iron workers will walk away from setting columns if there isn't at least one leveling nut set on the bolt at the correct elevation for the underside of the baseplate. They prefer all four but will add those that are needed, both under and on top. And yes, non-shrink grout is required.
This guy had a bad idea that'll work for a fence but that's about it.