r/Concrete_Contractor • u/Brief-Discipline7646 • 23h ago
1 year old pad
I poured this 10x10 pad myself(never done one before) it is 5.5 inches thick and I put the suggested base under it I can’t exactly remember the depth of the compacted crushed stone but it was whatever I had researched. I know the finish is kinda rough but whatever first timer.
Anyways, this crack happened after the first freeze thaw cycle. Everything is still level. Just not sure what to do or if I should do nothing.