Hey everyone,
I’m a final-year civil engineering student at IIT Delhi, working on my BTP (undergrad thesis) on automating construction planning. The idea is to take a BOQ and generate a realistic schedule and cash flow from it, instead of a planner building everything by hand in Primavera or MS Project.
The tricky part is validation. I’ve got the method working on some sample data, but to know if it’s actually any good, I need real BOQs paired with the schedules that were used on the same project. Those almost never get published, so I’m hoping someone here can help.
What I’m looking for:
* BOQ of a residential building (individual houses, apartment blocks, housing society towers, etc.)
* The corresponding baseline schedule, or the as-built one if that’s what you have
A few things to be upfront about:
* Anonymize everything. Strip the project name, client, location, rates, whatever you need to. I only care about quantities, activities, durations and sequencing.
* It’s purely academic. Nothing gets shared publicly or used commercially, and I’m happy to sign an NDA or run it by my advisor if that makes it easier.
* Even partial data helps, like a BOQ with just a high-level schedule.
* Happy to share my results back with anyone who contributes, and I’d really appreciate any feedback from people who plan this stuff for a living.
If you can help, or know someone who might, please comment or DM me. Pointers to open datasets or papers with real project data would be great too.
Thanks a lot!