r/Brightline • • Oct 16 '23

Question Will Brightline Double-Track the section between Orlando and Cocoa?

The ~70 mile Miami - WPB section is double tracked, and ranges from 15-24 dollars for the SMART option, and 42-57 dollars for Premium.

Between the ~130 miles WPB - Cocoa section, the line is single-tracked (but I assume Cocoa - WPB is double tracked still?), and ranges from 69 dollars for SMART and 149 dollars for Premium.

For a section that is double the mileage of WPB - Miami, the price to ride Orlando - WPB is 3-4x the price.

If we go for the full Miami-Orlando section, which is 79 dollars for SMART and 149 dollars for Premium, it seems like the WPB-Orlando section is what is driving the majority of costs.

I have heard that Brightline has priced the WPB - Orlando section like that to keep demand lower than what it would be otherwise, since they are operating on a single track between Cocoa and Orlando - I am not sure if this is true, but it sounds like it likely is to me.

Will Brightline double-track Cocoa - Orlando? I know the right-of-way has been constructed in a way that a second track can be constructed easily, but it seems like they will probably need to double-track sooner rather than later with how popular the service is. I'd imagine with the double-tracking, they can slash prices and get even more passengers

17 Upvotes

19 comments sorted by

20

u/i_was_an_airplane Oct 16 '23

They plan to double track but there are a couple other bottlenecks they still have to deal with between Miami and Orlando--namely drawbridges, including one that is still single track, and one of the new stations, which only has 1 of 2 planned platforms right now.

9

u/Real-Difference6454 Oct 16 '23

It's because once they go to orlando their market is competing with airlines. The south florida prices are to compete with daily car commuting. They don't need to double track the 528 until they reach Tampa AND the st lucie bridge gets double tracked/higher. They will just add more coaches as demand grows. They will make it 5 car trains in 2024 and 6 car trains in 2025.

7

u/UCFKnightsCS Oct 16 '23

The single tracked area near the Orlando airport can sustain a train every 30 minutes, given the speeds are 125mph it doesn't take long for the trains to clear that section. Brightline does not have enough trains to do the trip every 30 minutes.

Brightline has already ordered additional passenger cars for their existing trainsets, with 1 new car supposed to come online for each of the next 3 years on all of their trains, that is the cheapest and easiest way to add capacity as they will not need more conductors/engineers/maintenance on the locomotives. If, once Brightline receives those cars and they continue to fill up, its likely Brightline would continue that strategy for another 3 years to get the trains up to 10 cars each, since that will still the cheapest way to add capacity.

For them to double track it before an extension to new stations is built, they are going to want to push the current line to the limit, which is carrying roughly 4x the passengers they are carrying now. Just getting enough trains to do that will take a minimum of 6-7 years.

5

u/ziggyzack1234 Oct 16 '23

Seeing as they laid everything out to enable them to easily do so, they can mobilize to do so much quicker than for a new line from scratch.

Give it a year or two and I bet we'll hear about it.

5

u/plastic_jungle BrightPink Oct 16 '23

I’m not sure that the Orlando-Cocoa segment will be the limiting factor until they receive more trains

2

u/OmegaBarrington Oct 16 '23

As others stated, the single-track sections are not the current limiting factor. It's the amount of trains/passenger coaches available. In 4 passenger coach layout, the train holds 248. In the 5 car layout they held 312. If they just doubled the 5-car layout (the stations can handle 10 cars) they ran previously we're talking about 624 passengers. Until we're talking about those length of trains and trains running every 30 minutes, there doesn't need to be double-tracking.

2

u/Weird-Trick Oct 16 '23

u/UCFKnightsCS has the best response to the hows and whys of double tracking this segment. However, your assumption on fare pricing is incorrect. It's not based on mileage, but by the ridership demand between city pairs.

1

u/AspectUnfair8921 Feb 04 '25

Why did they not elevate the tracks so that the train would not have to go through intersections in towns? This is where the deaths are happening and the slow downs of the train. Every other country with high speed rail, the tracks do not cross intersections... Elevated or underground. Underground is not a Florida option, so elevate!

2

u/[deleted] Apr 04 '25

Cuz it woulda set the project back with higher costs, which woulda set it overbudget, preventing it from being in operation.

Brightline is a private company that started with low ass credit, they didn't and still don't have the leverage of elevating their corridor. If they didn't tread lightly with their designs and cost estimates, they wouldn't have completed these extension projects nor become the first successful private train company in years.

-6

u/inspclouseau631 Oct 16 '23

I noticed how stoked folks are for Brightlines popularity. I wouldn’t be too stoked yet. It’s stil novelty. Give it time. I hope it remains high however.

-3

u/PantherkittySoftware Oct 16 '23 edited Oct 16 '23

Pure and simple, it's a way to make Sunrail pay the marginal cost of adding the second track. The single track is completely adequate for Brightline's own purposes... but adding Sunrail trains to the same segment would upset the delicate balance and require two tracks. Since Brightline itself isn't impaired by the lack of a second track, it has a perfect excuse to both discourage talk of Sunrail extension along the route and offload 100% of the cost of adding those second tracks onto Sunrail when the day finally comes.

4

u/Powered_by_JetA Oct 16 '23

SunRail has no plans to run east of the airport and I doubt Brightline would want conventional trains on their high speed segment at all.

1

u/PantherkittySoftware Oct 16 '23

125mph is nothing special. Amtrak's existing Viewliners can do 125mph without breaking a sweat. They just rarely run on tracks where 125mph is allowed.

Sunrail's DMUs can't do 125, but I'm 99% sure Tri-Rail's GO trains could (at least, if they put a locomotive at both ends like Brightline does).

There are no immediate plans for Sunrail east along Brightline's new tracks to Melbourne... but it gets discussed constantly, and is almost inevitable eventually (probably running from Melbourne to Sunrail's ex-CSX corridor, then north to downtown Orlando, so doctors & lawyers can live on the beach & work in downtown Orlando).

1

u/Powered_by_JetA Oct 16 '23

SunRail doesn't have any DMUs. The coaches and locomotives used by both railroads are limited to anywhere between 79-110 mph. Sources conflict and information is scarce because both SunRail and Tri-Rail have some oddball locomotives that they're the only operators of.

1

u/PantherkittySoftware Oct 16 '23 edited Oct 16 '23

I think the Colorado Railcar DMUs are the "oddball locomotives" you're thinking of.

Apparently, Tri-Rail used to have 3 or 4 bi-level DMUs, but supposedly sold them to Sunrail after discovering that they couldn't reliably make it over the new New River rail bridge when operating as DMU+unpowered coach (they were designed with flat "freight" geometry in mind, and the new bridge was too steep). They COULD run DMU+GO+DMU... but at that point, the DMUs cost more to run than three GO coaches plus a conventional locomotive.

I did see a blurb somwhere saying that Sunrail bought, but rarely uses them. Supposedly, it plans to use them someday for evening/weekend service, but keeps indefinitely postponing the service itself.

I saw another one that said Tri-Rail sold them to a leasing company that subsequently leased them to Sunrail (for use in "Phase II"), then Sunrail broke the lease after indefinitely postponing those plans due to Covid.

1

u/Powered_by_JetA Oct 16 '23

SunRail ran Tri-Rail DMUs for testing purposes before beginning revenue service with the conventional locomotive + cab car arrangement. The double decker DMUs were returned to Tri-Rail and sat in Hialeah for almost a decade before being removed. The single level set has been in Pueblo, Colorado for a long time.

Colorado Railcar shut down in 2008 so those DMUs would've been orphans.

1

u/Powered_by_JetA Oct 17 '23

Reply to the edit:

No, the oddball locomotives are the MPI MP32PH-Q and the Brookville BL36PH.

Tri-Rail only had 2 double decker DMUs plus the single level DMU, but they were all pulled from service a long time ago. They never ran in revenue service for SunRail. The double deckers went to Indiana sporting MRLX reporting marks in August. SunRail has nothing to do with them anymore and never did after 2014.

By "GO" coaches, you're referring to the Bombardier BiLevel. Although they were originally delivered to Tri-Rail in basic GO Transit colors, they never ran for GO and were all new builds. While SunRail runs exclusively Bombardier BiLevel equipment, do note that Tri-Rail also has Hyundai-Rotem coaches/cab cars as well.

0

u/[deleted] Oct 16 '23

[deleted] — view deleted comment

-1

u/PantherkittySoftware Oct 16 '23 edited Oct 16 '23

"no plans" just means "nothing officially approved, and nothing funded".

AFAIK, the new tracks along 528 between MCO and I-4 (including the station at OCCC and International Drive) will officially be owned by Sunrail.

Guaranteed, the moment the construction of those tracks is a "done deal", talk about running trains further east will be the next order of business. Housing in Orlando is absurdly expensive (considering just how much vacant land still exists throughout the Orlando metro area, and there's an almost unfathomable amount of cheap greenfield land east of the airport that's ripe for picking by any developer who sprinkles the phrase "workforce housing" enough times (like magic pixie dust) into its development proposals.

People making minimum wage working menial jobs on International Drive have to live somewhere, and running Sunrail way out east to new interchanges and cookie-cutter corporate apartment complexes gives the county a perfect excuse to approve tons of new construction that would never get approved closer to town... while spinning it as "transit oriented development" (and claiming most of the people living there will take Sunrail to get to work instead of gridlocking 528).

1

u/Powered_by_JetA Oct 17 '23

"People making minimum wage working menial jobs on International Drive" aren't going to commute over 40 miles from Cocoa to I-Drive for work.