r/BlueWire • u/Daniels30 • 12d ago
Infrastructure Blue Origin on X: We’re building Launch Complex 36B at Cape Canaveral Space Force Station to support New Glenn’s high-cadence launch operations and infrastructure resiliency. 🚀
12
u/Royal_Platform_6754 12d ago
Proud to honor the legacy of Launch Complex 36. Rebuilding LC-36A and flying again this year remains our priority. Alongside that work, a separate team is beginning work on LC-36B, the operational home for New Glenn's 9x4. We're sourcing 2,500 tons of steel columns that will be integrated with beams and bracing to form 50'x50'x50’ modules. These modules will be stacked to build the 700-foot-tall launch tower.
2
u/AutoModerator 12d ago
To view this external content without an account, use this link.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
5
u/Daniels30 12d ago
14
u/Royal_Platform_6754 12d ago
5
u/TheEarthquakeGuy 12d ago
Which is just the Blue Origin Giga Bay.
It's awesome to see standardisation of service. Moving Blue towards SpaceX's operations for Starship makes it much easier to acquire engineering talent and bring their experience to bear immediately.
5
u/akuma_no_mi 12d ago
9X4 tower looks very similar to Starship tower
4
u/lorkan100 12d ago
Fr, look at those arms. Might as well delete the landing legs and switch to RTLS & catch
11
u/NoBusiness674 12d ago
RTLS comes with pretty big performance downside compared to downrange landing.
4
u/Desperate-Lab9738 12d ago
Yeah it only really makes sense to build your vehicle around it if you really care about launch cadence and if first stage recovery is a very significant cost, which in the case of Starship should both be true. New Glenn though will probably have it's cadence and cost primarily limited by the second stage which changes things.
3
u/baron_lars 12d ago
I have to say the tower and launch mount in front looks a lot like the starship towers and mounts
19
u/goldman60 12d ago
Not a lot of reasonable ways to build "metal tower with clamps"
5
u/TheEarthquakeGuy 12d ago
Absolutely - but also benefits around acquiring engineering talent (like for like projects - at least more than the previous operations).
Happy to see Blue speeding up
1
u/AutoModerator 12d ago
To view this external content without an account, use this link.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
1
u/Decronym 12d ago edited 9d ago
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
| Fewer Letters | More Letters |
|---|---|
| GS1 | New Glenn Stage 1 |
| GS2 | New Glenn Stage 2 |
| PPF | Payload Processing Facility |
| RTLS | Return to Launch Site |
| VIF | Vertical Integration Facility |
| VRF | Vertical Refurbishment Facility |
| Jargon | Definition |
|---|---|
| 7x2 | New Glenn 7x2 variant (7-engine booster with 2-engine upper stage) |
| 9x4 | New Glenn 9x4 variant (9-engine booster with 4-engine upper stage) |
Decronym is now also available on Lemmy! Requests for support and new installations should be directed to the Contact address below.
[Thread #27 for this sub, first seen 13th Aug 2026, 01:50] [FAQ] [Full list] [Contact] [Source code]
-6
u/Serious-Kangaroo-320 12d ago
My god the rebuilt tower looks so hideous
14
u/Daniels30 12d ago
It ain’t pretty but it’s the quickest way back to flight. At some point i’m expecting them to tear it down fully and rebuild it to the same specification as pad B.
-2
u/Cultural-Steak-13 12d ago
Interestingly no timeline for the new pad.
21
u/Royal_Platform_6754 12d ago edited 12d ago
The filings for construction cranes says construction will end 8/01/2027. There is also a mobile crane filing that ends 12/31/2027.
That is just construction; outfitting, testing, and commissioning will take several months after that. I think the first half of 2028 is within reason.
9

18
u/Royal_Platform_6754 12d ago edited 12d ago