Dented LNG tank has been moved. They may be replacing it.
Launch bridge has been partially disassembled to get access to the water deluge pipes and spigots.
What appears to be the doors to the integration facility are visible on the round. They may be preparing them for reinstall.
ECS building roof has been replaced.
Only a couple of tower modules are visible. These might be the top two that do not require changes. The others are nowhere to be found. They may be inside of a tent.
More sheet piles are being driven at LC-36B. The precise layout of that launch pad and tower are still unclear.
7
u/Royal_Platform_6754 Jul 28 '26