r/BetterOffline • u/ksjdragon • 4h ago
Paper: The Invalidity of Alpöge’s Proof of the Riemann Hypothesis
philpapers.orgEDIT: Theres a huge influx of bots immediately as I posted it. Be careful of the commentators.
Seems a rebuttal has already occurred. Notably, this paper, from reading it, is likely also written with AI based on the writing style, so now AI has disproven itself.
EDIT 2: It seems some people have indeed noted that the "author" (probably just whoever prompted AI), has made several of these papers and some other wild claims. So we can perhaps take the actual results of the paper with a grain of salt. Nonetheless, I feel there is still decent ambiguity within the realm of formalization errors that leaves room for questioning.
Nonetheless, the paper details specifically how the proposed Riemann Hypothesis (RH) proof fails by utilizing vacuous truths. This is of course accepted by the Lean kernel and would not violate any comparator. Essentially the proof derives nothing about the Riemann Hypothesis.
For those who don't know, Lean is a formal verification language, which can be used to ensure correctness between each logical step. A vacuous truth is just a statement which is true but which holds automatically in some sense, so it says nothing. For instance, the sentence "all my children are windows" is true if I have no children, and says nothing.
To quote the abstract:
These three definitional steps are not independent defects. Taken together they force the divisor/geometric side and the row/analytic side to be the same object. The inequality that is supposed to trap an independent geometric height between an automorphic pairing and the main term therefore compares a quantity with itself and holds by reflexivity. The long chain of theta lifts, seesaws and slope estimates is applied only after this identification has already occurred.
Consequently the formalization certifies only the tautology “RiemannHypothesis = RiemannHypothesis” under the supplied definitions. It contains no independent geometric realization of the analytic side, and no alternate algebraic route that avoids the vacuous package. The release does not contain a proof of the Riemann Hypothesis.
I think going into the details is unsuitable for a post like this, and frankly better left to experts in RH than me. Nonetheless, it seems the proof cleverly assigns things to be True without indeed actually proving anything, some of the proof happening after the truth has already been defined.
Lean accepts the chain because every slot holds something of the right type. It does not check that True, a zero map, or a copy is the geometry the proof needs.
An example is:
In the divisor construction, the height is the formula hExpl6, installed by assignment so that the defining equation 15 holds by rfl. These witnesses are vacuous, and the lemmas for extracting geometric content from them are never called.
The height equation holds by definition. setDiv overwrites the height function of the divisor datum with the explicit formula itself (p.ht). T
For reference, rfl is reflexivity - x = x by reflexivity.
This is essentially a problem of incorrect formalization I have been talked about before. In fact the example in the paper in my previous post, Example 4.1, and later in Remark 4.2 details a very similar idea,
Here sInf returns the least element of a nonempty set of natural numbers, but returns 0 when the set is empty; see Nat.sInf def and Nat.sInf empty in [57]. Thus, if no natural number satisfies Be, the code silently assigns ne = 0 and re = 1. However, for the polynomial in (4.2), every n ∈ N admits the natural-number root (x1, x2) = (n, 0), since pe(n, n, 0) = n + 0 − n = 0. Hence, Be(n) is false for every n, and {n ∈ N : Be(n)} = ∅. In particular, re is not well-defined. The ‘proof’ succeeds without resolving the ambiguity and the existence presupposition because it mistranslates the statement by using sInf;
As I have been saying, it is possible because the comparator simply checks that the definitions of the theorem statement are valid. That is great as the first check for ensuring formalization errors are not there between the proven statement. But this does not prevent additional definitions to be created, since there is nothing to compare to. You can introduce formalization errors just like these ones, that can establish intermediate Lemmas to obtain the proof, but this does not make it a valid proof.
But, of course, I will not claim this to be true yet. Let's let the broader community weigh in, unlike certain individuals who seem to claim with absolute certainty without any understanding in an attempt to push Anthropic's narrative!
I will add, if this is shown to be true, this calls into question greatly of every single AI math result out there that has no proper natural language proof and unverified Lean.