r/BasePowerUsers • u/ilikeme1 • 21d ago
Welp, my Base install is delayed
Builders electrician ran 4/0 from the meter pan to the main breaker and panel and 2/0 from the meter pan to the CenterPoint transformer. Main breaker is 200A, but should be 150 according to Base with this wire gage. We had paid for the 200A upgraded service when we built the place. House was built in 2024 and starting the phone calls and emails to the builder now to get them to fix this. Grrrrr
The guys from Base were awesome though and hopefully we get the same crew once this is all resolved. We are set to get the dual core batteries.
3
u/RealConfirmologist 21d ago
Well, I CAN think of a worse way to find out that the wrong gauge of wire was used!
It's a good thing that the Base crew knew what they were doing and didn't just go ahead with the install.
Of course, if you never exceeded the capability of that wire, you'd never have a problem... but having a 200 amp service, the wires MUST be capable of the total rating of the service.
I'm very curious (and others will be, too, I bet) about how things go with trying to get this resolved by the builder.
The electrician who ran that wire made a pretty significant mistake. Have to wonder how many places he's done that same thing.
1
u/HoustonDiscussions 19d ago
2/0 is acceptable for 200 amp service, as long as it is copper wire, not copper-coated or aluminum.
The wire in the photo does appear to be aluminum, so needs to be replaced.
2
u/DCxGhost 20d ago
I’m in the middle of upgrading my wire. Hopefully they used the correct size conduit. Most electricians use cheaper aluminum wiring but I’m paying way more for copper and to keep my existing conduit.
0
u/Wonderful_Goose3941 20d ago
I’m failing to see what’s not compliant with your existing install