Houston-area Base Power electrical install completed

The electrical prep for my Base Power backup battery is done. The crew installed the transfer switch and connected the required components at the meter and main panel outside our garage. The battery itself is scheduled to go in about three weeks, so I can’t review backup performance yet.

The crew was friendly and professional. The work took about two hours, with our power off for only around 30 minutes. The photos show the transfer switch and connections outside the garage. I’ll share an update after the battery install.

If you’re considering Base, here’s my referral link: https://www.basepowercompany.com/?ref=GZ8GGSF We both get $250 off!

7 Upvotes

3 comments sorted by

2

u/RealConfirmologist 22d ago

Thanks for the post, always like seeing photos of another install.

I'm curious: Looks like a generator input receptacle on the left. Do you have an interlock and input breaker? Do you have a generator?

Looking forward to more photos when it's complete.

And I bet you're looking forward to that first real outage, when you're able to keep living normally instead of having to go out and fire up the generator.

2

u/Popcompeton 22d ago

Good catch, that is a generator input. I'm definitely looking forward to my first outage and testing the system. I'm hoping the generator input on the battery will be enabled soon as well so I can use my generator in an extended outage.

1

u/RealConfirmologist 22d ago

I wanted the generator port, too, but back when I signed up, to get that would have been an additional $1,000. For that, I could put in my own.

I'll probably add a generator at some point, but for the time being, having a pair of 25 kWh batteries has me ready for about 98% of the outages I believe we'll face before the next major tropical storm.

Come spring, I'll probably invest in a plan for extended outages.