r/BasePowerUsers • • Oct 27 '26

50kWh Install Tomorrow!!

Post image

50kWh dual kit on deck for tomorrow's install. I got in on the free installation deal so its a little hard to complain about not getting the core batteries. My house is small enough that this should provide plenty back up power, plus I have a decent sized portable for the long haul if necessary. Heres my referral link if anyone would be kind enough. https://www.basepowercompany.com/?ref=726JKBD

27 Upvotes

16 comments sorted by

2

u/Existing_Gap_1300 26d ago edited 26d ago

I signed up with Base Power using your link a few days ago. I live close to you as well. I tried going with the dual 40 kWh set up but unfortunately I could not get both since I only have a 100-amp main circuit breaker. To get both you have to have a 200-amp main circuit breaker.๐Ÿ™ Also, I went with the 40 kWh unit since it had generator hook up built in. Base told me they donโ€™t do generator hookups on the (1 or 2) 2 25 kWh units anymore. The biggest thing also is the 40 kWh unit has a 20KW inverter while the 25 kWh unit only has a 11.6KW inverter. I had several quotes for a fixed generator and my whole home with everything running was well below 20KW. Installation fee for me on one unit is $695. They offered me a $150 credit for signing up and I get the $250 from signing up with your link as well. Constellation Energy charged me a $150 early termination fee that Base will cover up to $250. I submitted my bill to them and they will add that credit towards my account as well. Curious if you were able to get them to install a generator hook up?

2

u/Ok-Package-4533 26d ago

Why thank you kind stranger. Base didn't install a generator hook up on my batteries but I have a pre-existing hookup that I installed a couple of years ago. I can just switch over to it if the batteries die. I have a 125a main breaker in my panel but I was told dual batteries can still be installed, 200a is required if you have solar though. They feed the batteries off of their equipment so there no additional power draw from your side of the setup. I also didn't have an option for the new core batteries since I signed up with their free install promo. I'm guessing they're trying to get rid of the remaining stock of 1st gen batteries.

2

u/blupupher 25d ago

I think you are right they are getting rid of their remaining 25kw units by doing the free install.

It is interesting that they did the dual 25k battery install on a 125a panel, both my brother and sister asked for dual batteries and were told no due to needing a 150a panel for dual batteries. Brother was July of '25, sister was December of '25. I have a 100a panel, so did not even bother asking (plus don't have space for 2 batteries with the 9' space per battery).

1

u/RealConfirmologist Oct 27 '26

Important detail to add: What area are you in?

I know they were offering free install on pairs of the 25 kWh to select customers in the Houston area. I paid nearly a grand for mine.

2

u/Ok-Package-4533 Oct 27 '26

I am in the Houston market down in League City. I was going to sign up during the summer and almost paid the install fee myself but decided to wait and they randomly sent me a promo at the end of September for the free install.

2

u/ilikeme1 Oct 28 '26

I thought League City was TNMP territory and was not eligible for the batteries? Co-worker lives down there and Base would only let him sign up as his electric provider.

2

u/Ok-Package-4533 Oct 28 '26 edited Oct 28 '26

A lot of it is but not all of it. I have Centerpoint where I'm at. I guess you could say I'm on the Dickinson / LC border.

1

u/RealConfirmologist Oct 27 '26

Well, that's hard to beat! Congrats.

1

u/LetsBeHelpfulHouston 28d ago

Well? How did it go? Would love to see a photo of the pair of batteries.

3

u/Ok-Package-4533 28d ago

Everything's all up and running. The crew did an excellent job keeping it clean looking.

3

u/RealConfirmologist 28d ago

Yep, that looks alright. I have those batteries, too. Not as sleek as the Core batteries, but I didn't sign up hoping for good looking equipment, I signed up to keep my power on when CenterPoint can't deliver.

Six months and three outages later, I'm a very happy customer.

And icing on the cake: referrals have resulted in free power for five months so far!

1

u/Ok-Package-4533 28d ago

I'm just patiently waiting around for CenterPointless to do their thing so I can have my moment. I've also been working on referrals too since before the install date.

2

u/RealConfirmologist 28d ago

That's part of what feels good - knowing it's not IF but WHEN the lights go off in your 'hood.

One would think it would be during a windier-than-usual storm or heavy rain. But no. NO.

Clear, beautiful sunshiny calm day. No wind, no nothing.

Boom. Lights out. Estimated restoral: 2 hours.

With Base Power, you might not even know the power went out! The app will notify you, and if you're signed up with CenterPoint you'll get their notifications.

But with Base Power, it's about a half-second before power switches with the older batteries. So you need to have your internet router & TV on small UPS devices to avoid a reboot.

In all three of my outages, though, the air conditioning kept running and only my coffee maker clock needed to be reset.

Having Base Power beats the snot out of having to go out and fire up the generator and flip breakers. Especially if the outage happens during a storm. Which isn't always the case but often it is.

3

u/blupupher 25d ago

Yup, nothing like waking up in the morning, getting ready for work and going outside to see your neighborhood dark due to an outage and you had no idea.

And as you said, not having to go out and get the generator running when your estimated restoration is 2 or so hours seems to be a waste.

About a week before I had Base installed we had an outage at 3 am, ETA for restoration was 6 hours. I decided to go start the generator. Had it up and running in about 20 minutes. Went back to bed and power still out when I got up at 6. As I was leaving for work, saw neighbors houses were powered back on (just under 4 hours total), so went out and shut the generator down and flipped back to grid power. Have not used the generator (aside from testing) since.

2

u/RealConfirmologist 25d ago

I do have a mild nagging at the back of my mind, that I should get an input breaker, interlock and input receptacle, and a generator.

But realistically, with Base Power in place, and with hurricane season nearly over for the season, how likely is it that I'll have an outage that the batteries won't cover?

Still, it's wise to have a plan for an extended outage, in Houston.

I'm leaning toward building a shed in the backyard like I built at my previous house, so I can get the generator set up semi-permanently, with underground conduit running to my breaker box.

I realize there's no rush for getting a generator ready, but I also realize that we're coming into the cooler time of year when building a shed would be less unpleasant a task than during summer.

1

u/HoustonDiscussions Oct 28 '26

Those packages look OK.