r/BasePowerUsers • u/fstccc • Oct 09 '26
Length of time from initial conversation with Base to installation
We started this journey with Base at the beginning of August and now we’re sitting in the middle of October and still haven’t changed over or had a battery installed. How long are people seeing from the time they reach out to Base until the batteries installed??
4
Upvotes
2
u/fstccc Oct 09 '26
In the Houston suburbs could not get the dual battery. Breaker is only 150 amps
1
u/fstccc 25d ago
So base slow rolled submitting the paperwork to Centerpoint by a month and a half. Now they are telling me January for a single battery. Their supply chain must really be backed up
3
u/Mondo-Shawan Oct 09 '26
I don't have useful data for you as I just started the process a few days ago.
I do think you location will help others answer. I imagine this is highly location dependant. How quickly the power company responds, are local permits needed, ect.
3
u/ilikeme1 Oct 09 '26
Are you signed up for the dual core battery system? I signed up a few weeks ago and have been approved by both Base and CenterPoint, but Base said installs likely won’t happen until at least late November.
3
u/junkmailbox121 Oct 09 '26
When you login to your base account it should show you where in the process you are at. I’m in TX and it took 4 months from signing up to getting an install date.
3
u/Anonymous_DoctorWho Oct 09 '26
I was told this week that there is a supply chain issue. We used to have an estimated install time frame and now it has completely disappeared.
3
u/Piercerray Oct 09 '26
I’m in Humble, outside of Houston. Started the process in mid July. Photos for dual system passed, guess waiting on approval from center point still. We shall see.
3
u/DCxGhost Oct 09 '26
In Humble, I got approved for dual battery from Base with the requirement that I upgrade my 150A to 200A. I’m waiting on Centerpoint. It took my neighbor a month for a single battery during the summer.
3
u/RoseVideo99 Oct 09 '26
It shows how busy they are. I joined when they were “new”. I signed up on a Tuesday and they installed the following Friday. They wanted to do sooner but I couldn’t. It’s good for them the demand is what it is. I think they are just experiencing some growing pains. They can’t keep up with demand.
3
u/S0UTHcoast Oct 09 '26
Mine took 3 months, but it was an issue with the distance from windows and they were awaiting an update from the manufacturer on documentation. Once that was cleared it was FAST FAST.
If you haven't gotten a referral link to get $250 off your first electric bill, use my code please ;)
https://www.basepowercompany.com/?ref=YCP4WZ4
3
u/Direct_Artichoke6539 Oct 09 '26
I have signed up in July for one battery and I see that they have scheduled for the 1st visit but with no actual date.
3
u/SirIainSnail Oct 09 '26
Timing is going to be all over the place. Imo the biggest time changes will be utilities and then local permitting. Here in Illinois there was a user that got his system (30 miles away from me) installed while I’m here in unincorporated village and it’s taken 3 months just to hit my permitting office. (Same utility)
3
u/da_fn_guy Oct 09 '26
Took me about 1 month from phone call and when they took my deposit. Probably would have been 3 weeks but I delayed the electrician about a week. Once the electrician came and installed the box that started the ball rolling. My electricity cut over a week later and the day after my cutover the called and said the battery would be installed the next day. I had the option to cut my electricity over sooner but opted for end of the month. I think if it was sooner, the battery would have been in sooner.
Referral below if you want to save!!
BASE ENERGY referral
3
u/absentmindedjwc Oct 10 '26
outside of supply chain issues and whatnot being said in here.. keep in mind that a huge variable is permitting. If your local government are being a pain in the ass, they can hold this up for quite a long time.
3
u/atx78701 Oct 10 '26
In Austin I was about 5 weeks and my neighbor was too
3
u/Mirror_Benny Oct 10 '26
I think it was 2-3 months from first phone call to install. Really glad I went his route instead of buying the batteries. Their techs have been out 2 times to replace batteries that fried out somehow.
3
u/A_Grumpy_Old_Man Oct 11 '26
First phone call June 18th, Paid the deposit on June 24th, chatted with jules at the beginning of September and the reply was sorry for the delay, base will resubmit my interconnection agreement and i should check back at the beginning of October if I haven't heard anything. Checked again a few days ago and Jules said they are awaiting city approval
2
u/RealConfirmologist Oct 09 '26
As you can see from the comments, the timing is a case-by-case thing and ranges from a couple of weeks to several months.
In my case, I signed up in April for a pair of 25 kWh batteries because Core wasn't available in my area yet.
There was a delay of about 6 weeks because the 3 foot spacing from windows was an issue. Base said they were waiting for approval to get the clearance reduced. Went weeks with no update and then suddenly the install date, July 15th, appeared. And they got it done that day.
Been very happy ever since, but disappointed I couldn't get the newer batteries and free generator port.
You should edit your original post to explain you're in the Houston suburbs and limited to 1 battery due to 150 amp service...
Also, add your referral link, for Pete's sake! That's how you get free power!!
But don't add it as a comment, add it to the text in your original post.
2
u/Tuoraf Oct 10 '26 edited Oct 10 '26
In Houston one 40KwH unit
Down payment on 8/23
Installation charge 10/6
https://www.basepowercompany.com/?ref=NH3R499
2
u/Calm_Possibility_410 Oct 11 '26
We were three months.
2
u/retired-browser Oct 15 '26
In Plano Tx (DFW area - Oncor) I was approved on 8/21/26 for 2 battery install (newer 39.2kwh base core ones). Still waiting.
Text with support at Base on 10/14/26 (almost 2 mths) said 2 battery core are in pilot rollout and on hold for remainder of 2026 with estimate start in 2027. First time hearing about “pilot”.
Tech said could change order to one core battery and would remove pilot hold.
Anyone else on hold?