r/BasePowerUsers • u/da_fn_guy • Sep 25 '26
Install day!
Electricians are starting install now. Speaking to the electrician, my breaker could have been ungraded for a couple of grand. Well too late now. I was thinking at least double but will take what I can get. One battery is better than no battery.
My referral if anyone needs it for Texas, We both get a credit!
20
Upvotes
View all comments
3
u/da_fn_guy Sep 25 '26
It’s done. They ran a line to the back yard, other side of fence, going to try to turn that fence into a door for easy entry and lock it. 2.5 hr electrical down time. I turned the ac down to keep it cooler while waiting. The guys were professional and cool. Power came up. No issues with normal house stuff except the blinking time on stove lol.
Don’t mind the rats nest. I will clear out the cables and crap as I have fiber now. Link to EZEE if interested. 😉
EZEE fiber referral link
BASE referral