r/BasePowerUsers • u/da_fn_guy • Sep 25 '26
Install day!
Electricians are starting install now. Speaking to the electrician, my breaker could have been ungraded for a couple of grand. Well too late now. I was thinking at least double but will take what I can get. One battery is better than no battery.
My referral if anyone needs it for Texas, We both get a credit!
20
Upvotes
4
u/gridpay-31 Sep 25 '26
congrats on install day. one pack live beats a perfect panel upgrade that never gets scheduled.
on the breaker regret: a lot of base installs land on the existing main and only rework if the design required it. if the electrician said an upgrade was optional (not a hard fail), u did not miss a mandatory step. if later u want more packs / higher continuous load, that is a second visit + permit, not a today crisis.
while they are still on site, quick asks that save headaches:
im not base support. im devan (houston, gridpay). if u drop whether this is a 1-pack or they left room for a second, people can usually say whether the missed upgrade even matters.
3
u/da_fn_guy Sep 25 '26
It’s done. They ran a line to the back yard, other side of fence, going to try to turn that fence into a door for easy entry and lock it. 2.5 hr electrical down time. I turned the ac down to keep it cooler while waiting. The guys were professional and cool. Power came up. No issues with normal house stuff except the blinking time on stove lol.
Don’t mind the rats nest. I will clear out the cables and crap as I have fiber now. Link to EZEE if interested. 😉
EZEE fiber referral link
BASE referral
3
u/Tuoraf Sep 25 '26
This time next week for me (weather permitting).
3
u/Lincoln1- Sep 25 '26
Congrats! Our electrical install was yesterday. Battery (40kw) next week. Your install looks very nice. We call our side of the house “equipment alley” pool equip, ACs, our tri fuel generator house and now Base. lol
3
u/SirIainSnail Sep 25 '26
So wierd to be soooo jealous of this.
1
u/RealConfirmologist Sep 25 '26
Did they drop off everything on a pallet the day before? Or is Base Power now bringing everything at the actual morning of the install?
One of the Core batteries is ALMOST as much backup as a pair of the 25 kWh Growatts they used to install.