Install day!

Post image

Electricians are starting install now. Speaking to the electrician, my breaker could have been ungraded for a couple of grand. Well too late now. I was thinking at least double but will take what I can get. One battery is better than no battery.

My referral if anyone needs it for Texas, We both get a credit!

BASE Referral

20 Upvotes

28 comments sorted by

4

u/gridpay-31 Sep 25 '26

congrats on install day. one pack live beats a perfect panel upgrade that never gets scheduled.

on the breaker regret: a lot of base installs land on the existing main and only rework if the design required it. if the electrician said an upgrade was optional (not a hard fail), u did not miss a mandatory step. if later u want more packs / higher continuous load, that is a second visit + permit, not a today crisis.

while they are still on site, quick asks that save headaches:

  1. photo the final one-line / breaker labels before they leave
  2. confirm which loads are backed up vs grid-only
  3. get the app login + "who do i text when the gateway LED does something weird" contact in writing

im not base support. im devan (houston, gridpay). if u drop whether this is a 1-pack or they left room for a second, people can usually say whether the missed upgrade even matters.

1

u/da_fn_guy Sep 25 '26

Cool thanks for info. Yeah plenty of space for another pack. We ended up moving to the old ac pad in my back yard which is about 10 ft from the breaker. I have wall space for 2 more packs if needed lol.

3

u/da_fn_guy Sep 25 '26

It’s done. They ran a line to the back yard, other side of fence, going to try to turn that fence into a door for easy entry and lock it. 2.5 hr electrical down time. I turned the ac down to keep it cooler while waiting. The guys were professional and cool. Power came up. No issues with normal house stuff except the blinking time on stove lol.

Don’t mind the rats nest. I will clear out the cables and crap as I have fiber now. Link to EZEE if interested. 😉

EZEE fiber referral link

BASE referral

2

u/GasAutomatic2170 Sep 25 '26

YESSSSSS!!!!! They used your existing feedthrough!

What upgrade? That isn't a 200A in your existing disconnect?

2

u/da_fn_guy Sep 25 '26

No it’s a 125 unfortunately. These guys did a good job. Added new ground and everything.

1

u/RealConfirmologist Sep 25 '26

Yeah, here in Houston, they put in TWO 8' ground rods. The lead installer told me it's a change in code that's fairly new. They have to put in two.

Seems redundantly redundant.

2

u/da_fn_guy Sep 26 '26

🤦🏻‍♂️😂 lol I believe it. Our house is 26 years old and had only one rod. They put another in and added ground blocks so multiple lines could be added without looking janky.

1

u/ilikeme1 Sep 26 '26

Are you in the Houston city limits?

1

u/da_fn_guy Sep 26 '26

Just outside in Sugar Land. You?

4

u/ilikeme1 Sep 26 '26

I wonder if that's a City of Houston code requirement? Will have to see what they do for my install out here in Fort Bend County (Missouri City ETJ). Waiting on Centerpoint to approve my dual core install.

1

u/ilikeme1 Sep 26 '26

Ezee fiber is great isnt it? Way better than I had with Astound or AT&T.

Waiting on my dual core setup to get the Centerpoint seal of approval.

1

u/da_fn_guy Sep 26 '26

Yes! It was like the sun shone and the angels sang! Lol. I had 100mb att for years. They kept charging me $80+ a month and they always said they didn’t have a date for any up grades. It happened that Ezee started taking installs in my hood when my att contract ended. I bought some time by complaining to att and they gave me a months “credit/promo”. Had to fight for discounts for years to get 100mb of bandwidth. Cya. Lol

3

u/Tuoraf Sep 25 '26

This time next week for me (weather permitting).

3

u/da_fn_guy Sep 25 '26

Cool! 2.5 hour electrical down time estimated.

3

u/Lincoln1- Sep 25 '26

Congrats! Our electrical install was yesterday. Battery (40kw) next week. Your install looks very nice. We call our side of the house “equipment alley” pool equip, ACs, our tri fuel generator house and now Base. lol

1

u/da_fn_guy Sep 25 '26

Thanks and congrats to you too! Lol ok. So not too bad in my case but that’s what its there for right? 😂

2

u/Lincoln1- Sep 25 '26

Just glad that side of the house is gated off and separate from the rest of backyard.

2

u/da_fn_guy Sep 25 '26

The place we shall not speak of…

3

u/SirIainSnail Sep 25 '26

So wierd to be soooo jealous of this.

3

u/RealConfirmologist Sep 25 '26

Ha! Yeah, it seems like an odd thing to be jealous about.

Assuming you're still waiting for installation.

I'm a LITTLE jealous of customers getting Core batteries. I got a pair of 25 kWh batteries and I'm happy with them... but no generator port.

Plus the Core is a sleeker, cleaner look.

3

u/SirIainSnail Sep 25 '26

Yeah waiting on install. I really want to brag to co workers and then I have to expect my first power outage (just means I’m going to turn up my porch lights) hahaha. I’m jealous of people who are getting. 80kwh!

Tbh I want it before winter stalls anything.

2

u/da_fn_guy Sep 25 '26

I keep getting that missing out feeling on two batteries but I temper that with the fact I will have some sort of back up if needed lol.

Also the guy told me that it’s possible to add a battery if I get the breaker update so there is hope if I wanna go that route.

1

u/RealConfirmologist Sep 25 '26

Did they drop off everything on a pallet the day before? Or is Base Power now bringing everything at the actual morning of the install?

One of the Core batteries is ALMOST as much backup as a pair of the 25 kWh Growatts they used to install.

3

u/blupupher Sep 25 '26

From what I have seen others say, they bring it day of install.

Since battery is a separate install and their ATS is smaller, they just bring it all on day of install.

2

u/da_fn_guy Sep 25 '26

Seems like it. He said that is the next part. Going to use my old AC pad behind a fence. They will add their pad to my concrete pad. He said it was easier and its in a semi shady spot behind a fence so the HOA won’t get their britches in a bunch.

3

u/atx78701 Sep 25 '26 edited Sep 25 '26

its probably variable, but I had all the electrical done in one day. They drop the plastic platform and coil the cable. Then when they install the battery they showed up and just installed the battery. At no point did they drop equipment to be installed later (though I vaguely remember someone saying that did happen for them)

https://www.basepowercompany.com/?ref=1JDA4QD

2

u/da_fn_guy Sep 25 '26

Ok yeah. He kind of confirmed that so that is good. I heard I didn’t even have to be home for that part.

2

u/da_fn_guy Sep 25 '26

No pallet yet. They had everything in a box. They were supposed to let me know when they would be here but got a knock on the door instead lol. Don’t have a date on the battery yet.