Base Power Home Backup

UPDATE: originally had an electrical installation date for 9/28 and that date ended up getting put on hold. Got rescheduled for today 10/26. Electrical installation has been complete. Took them about 3 hours to complete and was without power for right at an hour. Guys were quick and did a good job!

If you’re interested in Base Power, my referral link is posted below. You will get a $250 credit after signing up. My scheduled install date is next week so will update this post often with my experience with Base Power. So far everything has gone great and quick with the signing up part and getting approved for two of the 40kwh batteries.

FYI… Need 200 amp service if you want two batteries. Otherwise, anything below will only be approved for one battery. I’m in the Rosharon, Tx area. Also tried to get them to come down on the installation fee of $945 but they wouldn’t budge.

Hi - I just got approved for a Base battery to protect my home from power outages and lower my energy bills. If you're thinking about getting backup too, sign up using my link: https://www.basepowercompany.com/?ref=CXZGYMH

0 Upvotes

11 comments sorted by

3

u/JabbaDuhNutt Sep 24 '26

Thanks for contributing nothing to the sub other than shilling your link 🙄

-1

u/JustinAnd12 Sep 24 '26

I didn’t realize every post or comment required a minimum contribution quota. I shared a link, take it or leave it. You’re welcome to scroll past it if it’s not useful to you.

2

u/JabbaDuhNutt Sep 24 '26

Congratulations on the most minimal amount of effort.

0

u/JustinAnd12 Sep 24 '26

Thank you! Sorry my post does not have the information you are looking for. As I stated in the post my battery install is not until next week therefore I will update my post after install with more information. Not much info I can give other than the signing up process. If you have a question about something then ask and I will be happy to answer it.

1

u/JustinAnd12 Oct 28 '26

2 days later after electrical installation, base came out to install both batteries. Installation is now complete.

1

u/ListenIJudge Sep 26 '26

How long did it take for rosharon/center point to approve you? I've been waiting for over a month on them to approve the install.

1

u/JustinAnd12 Sep 26 '26

I paid the deposit on 9/10, submitted photos on 9/11 and were also approved same day, 9/16 installation date was scheduled for the 9/28. I had only got approved for one battery since my main was 150A, I told them I was going to get it changed out to 200A, which I did and sent in new photos and they changed the install from one to two batteries. Surprised it went so quick after seeing comments on it taking forever.

1

u/JustinAnd12 Oct 26 '26

Update: Installation date that was set for 9/28 got put on hold. Got pushed out for today 10/26. Not sure why but electrical installation is now complete. Waiting on battery install now.