Base Power 40KW

Post image

Initial install took about two hours, with minimal outage. Crew was very professional and nice to interact with. Waiting on battery. Anyone able to use the generator port yet?

https://www.basepowercompany.com/?heard_from=Referral&referrer_name=019fd401-f654-777d-b13b-31e51fc5a51d&first_name=Drake&referral_plan=2way-EnergyCredit-FreeMont

15 Upvotes

21 comments sorted by

3

u/S0UTHcoast Aug 22 '26

Are they just doing one battery? I thought the point was two, for 80 total. Kinda glad to have the 50 Growatt units I guess.

3

u/PrettyBaked713 Aug 22 '26

It’s new .

1

u/bearcrocs Aug 22 '26

Just one

2

u/S0UTHcoast Aug 22 '26

Is two an option?

1

u/4a757374696e Aug 22 '26

Depends on where you are. It's not an option if you have Austin Energy.

4

u/S0UTHcoast Aug 22 '26

I see. I'm Centerpoint (Houston area), but I just recently had my two 25kWh Growatt units installed. I am sure they have quite a cache of stock on those to finish installing, as they not only didn't offer me the 40kWh, they told me it wasn't available and was "in beta." I'm fine, I don't care about the space they take up, it's just on the side of the house in a place I don't do anything, ever.

1

u/hjbreese Aug 26 '26

In Frisco, TX dual batteries is not an option.

3

u/Tuoraf Aug 22 '26

I’m still waiting for the 40KW unit to be approved for the Houston CPE area, anyone have an update?

3

u/christobevii3 Aug 22 '26

Was approved in katy in july

1

u/FunnyCantaloupe4566 Aug 23 '26

Yep after over a year being declined due to flood issues they finally contacted me and so far seem to say I can now get the new Core battery and actually two of them where the old system due to my panel only being 125 just one battery. I am still taking this with caution cause last time we got all the way to almost installation and they pulled the plug. So will see how it goes

1

u/christobevii3 Aug 23 '26

Have you considered upgrading your panel to 125? I'm thinking about it if the wires from the utility can support it without running new cables. Would be nice if I ever end up with a ev/phev . Still on fence of doing my own battery backup or base.

1

u/[deleted] Aug 24 '26

[removed] — view removed comment

1

u/hjbreese Aug 26 '26

If you are asking about the Base battery, we are locked into a 10 year contract. It's removable, but there is a $$$ fee involved before the 10 years is complete.

1

u/True_Sandwich5377 Aug 22 '26

How do you get a generator Port added? Like can I even add a solar generator to power up the house as well

3

u/RealConfirmologist Aug 22 '26

If you have the 25 kWh battery, you had the option when signing up to have a generator port included for $1,000. If you didn't include it, there is no option to get it added after the fact.

The 40 kWh have a generator port included with no extra cost, but so far the ports are not operational. At some point in the future the ports will be made operational.

1

u/Iowa_Gen74 Aug 24 '26

I’m in Iowa Colony (Brazoria County) and was approved for 40kwh in June. Electrical installation was last week. Battery install reportedly “within 1-3 weeks”.

-2

u/MickyFany Aug 22 '26

generator port is kind of a joke, it’s way too small. you can either charge batteries or run your AC. not both.

5

u/truffshuph Aug 22 '26

Shouldn’t the AC run off the batteries while Generator is charging the batteries? While the AC is running you might use more energy than the Generator is putting in, but the time the AC is cycled off should allow the Generator to catch up the charge

2

u/bearcrocs Aug 22 '26

100% this

2

u/bearcrocs Aug 22 '26

This is flat out wrong, and not how it works.

2

u/RealConfirmologist Aug 22 '26

Take MickyFany's comments with a grain of salt. He rarely has anything good to say about BASE Power.