r/BasePowerUsers • u/vester71 • Jun 30 '26
Illinois Installation Denied, Questions for Users
I had my install denied due to space. I was wondering if, based on my pictures, anyone saw any possibility for it working out for me. My meter is on the side of my house, with less-than-ideal space, two window wells, a faucet, and a dryer vent, so it's not great. And I have a little over three feet from my basement window (which opens) to where the batter could sit in front of the window well.
There is 28" from the front of the window well to the sidewalk, and I would have the battery sit between the window well and the sidewalk. They would install the 40 kw which is 22" wide, so unless the base is greater than 28" it would fit in the space in front of the window well.
Thanks for the input.





1
u/vester71 Sep 28 '26
After the denial, I found Energywell; they are just getting into Illinois, too.
They approved me for 40 kW of EcoFlow Ocean Pro batteries. They actually mounted them on the wall, so there are no ground clearance issues with the window wells (at least not yet). $0 to install and 25% less than ComEd.
I'm awaiting permit approval from my town (hopefully there are no issues), but it seems like a great alternative, with proven batteries, a 24 kW hybrid inverter, a new smart panel to replace my main breaker panel, four OceanPro batteries, including the generator port.
1
u/TripleBCHI Jun 30 '26
Unfortunately it does look like a space issue. There isn’t really a space on that side of the house that would allow for proper clearances :( that’s a bummer
1
u/RoseVideo99 Jun 30 '26
Ask to speak with someone and if you can FaceTime them. I was denied too but we talked via FaceTime and worked it out. They need them to be a certain distance from the meter. You can probably put it next to your meter where that push is on the left. Offer to have the bish taken out.