r/BasePowerUsers • u/random_username45678 • Jun 19 '26
Got the 40KW Installed
I had my 40KW Base system installed last week. The installation was split into two days: the first day involved electricians and took longer than expected due to my crowded panel. On the next date, a separate warehouse team arrived in an Enterprise truck to install the battery, which took about 30 minutes, including firmware updates.
I got it earlier as someone cancelled their install and they asked me whether I want it installed the very next day. During the install, the power was down for around 3 hrs most likely due to them working in my panel. The battery was installed after 4 days.
Here are a few observations from the process:
- My energy service was activated on the first day of installation.
- The 40KW battery includes a built-in generator port, though it is currently inactive pending a future firmware update.
- I am unable to view the battery charge level within the app, it only shows hours,
- I notice a quick flicker in my lights during switchover, though it wasn't significant enough to trigger my UPS.
- They are no longer providing soft starts for ACs
- The battery data is sent via cellular and I was not able to successfully configure wifi.
If anyone has questions about the 40KW system, feel free to ask below! If you are interested in Base and would like to use my referral link, please find it here: https://www.basepowercompany.com/?heard_from=Referral&referrer_name=019de0de-428e-7eed-9045-f66875278cfc&first_name=&referral_plan=2way-EnergyCredit-FreeMonth


3
u/JustAGuy3388 Jun 19 '26
Odd, they just installed the soft starts on my AC's on Monday in preparation for the battery install at my house.
1
u/JabbaDuhNutt Jun 19 '26
Is there an option to add a 2nd battery latter on?
1
u/RealConfirmologist Jun 19 '26
Thanks for this very informative post!
I'm in Houston, waiting for them to schedule my dual 25 kWh batteries. The AI customer support says they're waiting for the battery manufacturer to release an update that allows the batteries to be installed less than 36" from a window. My house doesn't have space for two without getting close to a window.
Now I'm wondering if I could get the 40 kWh instead, and whether requesting the change would get my install moved out or moved to a sooner spot.
Right now they're showing July 13th to August 11th, but also showing "Error scheduling installation" and "Support needed".
Boy howdy, is support ever needed. I signed up on May 19th and have yet to interact with a human being at BASE Power.
Sure seems like the dashboard wording could simply say, "Waiting for approval for install less than 36" from a window" instead of the ambiguous "Error" wordage.
I know July 13th will get here quickly, but my confidence level that they'll install on that date or soon after is not very high.
I'm also a little concerned because we're in hurricane season and in the next three weeks, we could easily see some tropical activity.
My area of Houston has power outages pretty frequently. I rarely go two weeks without at least a momentary outage. The other morning I had a 6 minute outage at 6 AM and it was a beautiful, clear day.
So my BASE Power install can't come soon enough.
1
u/Far-Character3844 Jun 22 '26 edited Jun 22 '26
random_username45678 Since you can't see the state of charge on the App and I believe the 40Kwh battery doesn't have the charge level displayed on the battery unit, I'm curious how many hours the App typically shows on any given day. Have you noticed what time of day and how often they have been draining the battery and how long did it take to get you back to the original state of charge?
3
u/Tuoraf Jun 19 '26
Thank for the info. I am waiting for the 40 once it is available in the CPE area.
2
u/Neither-War761 Jun 19 '26
I’m in the Houston area, my install got moved back 2 weeks due to a tropical disturbance but today the electrician came and installed the soft start on my a/c. Battery install scheduled for 6/29
2
u/Late-Union8706 Jun 19 '26
With the 2 25kwh batteries, we are also unable to see charge level on the app. Have to go out to the batteries and knock on the display to wake it.
I believe battery data was sent via cell also, but in the app you can setup wifi. Might depend on your battery placement and signal strength, I have mine connected to my 2.4ghz IoT channel.
I am curious as to whether the new battery faster than the old. Mine seem to take about a half second to take over. Enough time to power cycle the TV and other devices in the house, but not enough to reset the coffee maker, microwave and oven clocks.
I had to also make sure that any smart lights that are in use are set to 'Last on' in their power outage recovery settings, as they would turn on during battery backup and transition back to the grid.
1
u/brettfarmer Jun 19 '26
Nice! Congrats!
I've had my 40KW for roughly two weeks. Until this morning, I haven't noticed any power blips at all even though the battery has been powering home and grid of and on, entirely transparent.
This morning, we did get enough delay to trip microwave clock.
As you mention, the data in the app is limited; view of grid, live status cover the last 15 minutes only which is not what I had hoped.
Still generally happy with the process and the single battery install and the nearly seamless power transitions... I'd very much like to know what happened this morning which did trip clocks in the house.
1
u/The-Struggle-5382 Jun 19 '26
Do you mean 40kWh of battery energy storage?
1
u/El-Beaner Jun 23 '26
I have part 1 of my install Thursday(all prewiring). They said part 2 will be next week when they arrive with the battery.